53
SECTION 4
MAINTENANCE
IV. MAINTENANCE - EVERY 6 MONTHS
NOTE: It is recommended that the 6 Month Maintenance schedule be performed by an Authorized Middleby Marshall
Service Agent.
CAUTION:
All electrical power should be shut OFF
and locked out or tagged out before attempting
maintenance in steps "A" thru "C".
A. Check brushes on D.C. conveyor motor, when worn to less than 3/32" (2.2mm) replace.
B. Burner nozzle and electrode assembly should be cleaned and inspected. Also check your oven venting system.
C. Check conveyor shaft bushings and spacers. Replace them if they are worn.
The following parts were shipped inside the control compartment of your oven to be used
for preventive maintenance or as spares. It is recommended that whenever you use one
of these parts you should order a replacement from your local authorized Middleby
Marshall Parts Distributor.
MAINTENANCE PARTS
QUANTITY
MIDDLEBY MARSHALL
DESCRIPTION
PART NUMBER
2
28154-0003
TRM 9 Amp Fuse (See Figure 6-3)
1
22181-0034
Fan Belt (Refer to previous
page for fan belt replacement.
Содержание RED LOBSTER PS200-R68 Series
Страница 6: ...NOTES...
Страница 30: ...24 SECTION 2 INSTALLATION NOTES...
Страница 40: ...34 SECTION 3 OPERATION NOTES...
Страница 60: ...54 SECTION 4 MAINTENANCE NOTES...
Страница 68: ...62 SECTION 6 PARTS LIST FIGURE 6 2 AIR FINGERS 9 4 3 2 1 6 7 8 5...
Страница 80: ...74 SECTION 6 PARTS LIST FIGURE 6 8 ELECTRIC OVEN ELECTRIC PANEL j 3 5 1 11 7 6 4 2 9 10 8 12...
Страница 84: ...78 SECTION 6 PARTS LIST NOTES...
Страница 85: ...79 SECTION 7 ELECTRICAL SCHEMATICS SECTION 7 ELECTRICAL SCHEMATICS...