Mid-Continent Instruments and Avionics
Revision D, March 21, 2016
Manual Number 9018205
9
SECTION 3 INSTALLATION
3.1 GENERAL
This section contains interconnect diagrams, mounting dimensions and other information pertaining to the
installation of the MD93 Digital Clock / Dual USB Charging Port. After installation of cabling and before
installation of the equipment, ensure that power and ground are applied to the proper pins specified in
Section 3.4.2, Pin Assignment Information.
3.2 PRE-INSTALLATION
INSPECTION
When unpacking this equipment, make a visual inspection for evidence of any damage that may have
occurred during shipment.
3.3 PARTS
3.3.1 Included
Parts
The following parts are included:
Digital Clock / Dual USB Charging Port
MCIA P/N 6420093-( )
Installation
Manual
MCIA
P/N
9018205
Installation
Kit
MCIA
P/N
9018178
o
Mating Connector, 4-pin
o
Pins (6) (4 required, 2 spares)
o
Screws (5), #6-32 x 3/8” Flat Head (4 required, 1 spare)
3.3.2 Optional Available Parts
No additional parts or components are available.
3.3.3 Installer Supplied Parts
Cable Harness Wire, See Section 3.4.1 for specifications
Circuit Breaker Recommendation 2.5 amp (1.5 amp may be sufficient for 28V aircraft)
(as needed per system requirements)