A. With motor running check burner line voltage terminals for 120 V as follows:
    1.  Between strip terminals 

L1

 and 

L2

 - 120 V: voltage OK.

    2.  Between strip terminals 

L1

 and 

GND.TERM

 - 120 V: ground OK.

    3.  Between strip terminals 

L2

 and 

GND.TERM

. - no voltage: no backfeed neutral OK.

B. Follow test procedure as specifi ed in Step II G.
    1.  Connect DC microamp meter in series with sense wire and Electronic Control SENSE    
      terminal. With fl ame on, fl ame signal should be steady and at least 2 microamps. Check  
      sense wire for continuity Adjust ignitor gas pressure to obtain acceptable signal and note  
      gas pressure and signal strength for future reference.

A. Low gas pressure

B. Air shutter open too far
C. Input adjuster not set properly

A. High gas pressure

B. Air shutter closed too far
C. Insuffi  cient free air in combustion chamber
D. Dirty blower wheel
E. Input adjuster not set properly

A. Defective automatic valve

B. High gas pressure

*Normal low voltage:
  Motor running - 24 V minimum
  Automatic valve energized - 21 V minimum
             __________________________________________

 

IV Short Flame

V Long Hazy 
Flame

VI Gas Fails to 
Shut
O

 

Trouble Chart

III  Flame on Only 
During 6-Second 
Trial for Ignition

Содержание Incinomite J83-DS

Страница 1: ...his or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately phone your gas supplier fr...

Страница 2: ...000 feet by 4 for each 1000 feet of additional elevation 4 100 MBH 100 000 BTU Hr 5 Kit is available for eld installation Specifications 1 Speci cations and Installation No 1 Waste Primarily dry mater...

Страница 3: ...arometric damper of the same size as the vent connector should be installed If the chimney is high enough to make it di cult for the barometric to maintain a maximum incineration chamber over re draft...

Страница 4: ...800 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 PROPANE PROPANE Gas 2 500 BTU Cu Ft with 3 8 Main Gas Port 8 0 9 0 10 0 11 0 Capacities shown are for total pressure drop of 0 3 W C For higher permissible press...

Страница 5: ...based on the pressure available at the inlet to the supply pipe branch line when all other gas equipment fed by the same source NATURAL gas meter or PROPANE tank regulator is ring at full rate Also ta...

Страница 6: ...ION Purge outside the building Do not purge into the incineration chamber 5 Turn on the Fused Disconnect Burner Switch or Timer Let motor run long enough to accomplish four air changes Note that motor...

Страница 7: ...cineration chamber pressure stays within the range of 0 to minus 0 5 W C 16 WARNING When the incinerator is located inside a building and a draft control is used check that there is no spillage of ue...

Страница 8: ...to the Ground Barrier It should be audible and visible though it is rather thin and di cult to see in bright light CAUTION Circuit has 30 000 volt open circuit potential If the spark is not audible o...

Страница 9: ...against the side plate of the blower housing Testing the switch to prove that it is functional can be done by removing the ignitor assembly and blowing hot air through the opening toward the blower in...

Страница 10: ...Valve terminal and strip terminal 10 No voltage Electronic Control or Fuse is defective 2 Check for 24 V between strip terminals 7 and 10 No voltage blue wire from strip terminal 7 is defective 3 Chec...

Страница 11: ...t 2 microamps Check sense wire for continuity Adjust ignitor gas pressure to obtain acceptable signal and note gas pressure and signal strength for future reference A Low gas pressure B Air shutter op...

Страница 12: ...oria Street Chicago Illinois 60646 toll free 866 705 0514 tel 773 604 8700 fax 866 580 8700 web www midcointernational com e mail sales midcointernational com 12 Printed in USA 8470 23 ISO 9001 C O MP...

Отзывы: