Installation
5-26
SCM4000
Technical Reference Manual
When the wiring and mounting are completed, it is time to power
up the SCM4000. As good practice, you should make a final
check before power is applied.
5.11.1
Checks before power-up
Here are your final pre-power-up checks:
•
Double check to be sure all the cables are connected to
the correct connectors.
•
Make sure the connections are all fully mated and locked.
CAUTION
Be sure the power being supplied matches
the power required by the equipment.
5.11.2
Initial power-up
Now you are ready to apply power:
1.
Verify the power cable is properly connected to the
SCM rear panel power connector.
2.
Verify all coaxial cables and cable connectors are
properly connected to the rear panel connectors.
3.
Connect the SCM power cable to AC/DC power of the
correct type and voltage.
4.
Verify the power source is turned on.
5.
Set the SCM4000 rear panel power switch to on (
I
).
6.
After approximately a 10 second delay, the normal
power up sequence is as follows:
-
The front panel green
POWER
LED illuminates.
-
The alphanumeric display illuminates and the Main
Screen is displayed.
-
The power up sequence is normal.
.
7.
If everything appears to be normal, test the
performance of your SCM4000 by setting up a link and
transmitting and/or receiving video and audio.
If you have any problems, refer to the
to determine the cause.
5.12
The product you purchased has been carefully designed and
tested, and is warranted to meet specifications when connected
and operated as described in this manual.
Note
If you modify a product without authorization from
MRC, you will void the warranty.
For a complete Warranty statement, refer to the “
“ section
at the front of this manual.
Содержание SCM4000
Страница 1: ...Manual Part No 400509 1 Rev A February 2006 Technical Reference Manual Single Carrier Modem SCM4000 ...
Страница 2: ......
Страница 14: ...Introduction 1 4 SCM4000 Operator s Guide This page intentionally left blank ...
Страница 234: ...Repair 6 2 SCM4000 Technical Reference Manual This page intentionally left blank ...
Страница 242: ...Theory of Operation 8 6 SCM4000 Technical Reference Manual This page intentionally left blank ...
Страница 250: ...Glossary A 8 SCM4000 Operator s Guide Tech Ref Manual This page intentionally left blank ...
Страница 266: ...Symbol Rate Calculations C 8 SCM4000 Technical Reference Manual This page intentionally left blank ...
Страница 274: ...Index 8 SCM4000 Technical Reference Manual This page intentionally left blank ...