Microsemi SP4 Скачать руководство пользователя страница 5

 

 

5/5 

Application note 

APT0501 

December 2011 

www.microsemi.com 

5.

 

Mounting instruction without using the plastic post. 

 
For important temperature variations, extremely 
low and high temperatures or strong shock and 
vibration environment, screwing the PCB onto 
the plastic posts is not recommended. The plastic 
expansion leads to some mechanical stress that 
can damage the tracks or the components on the 
PCB. 
 
 

On the other hand, the plastic posts may break 
under strong shock and vibration stress. 
In order to avoid these phenomenons, the 
utilization of metallic spacer 18

±0.2

mm high is 

recommended to screw the PCB on top of the 
power module.  (See fig 8). 
 
 

 

Fig 8: PCB screwed onto the metallic spacers. 

 
 
 
 
 
 
6.

 

Connection push-pull forces. 

 

When the PCB is mounted onto the power 
module and the terminals soldered to it, some 
mechanical forces may be applied to the 
terminals.  Such push or pull forces must not 
exceed 10N (2.25lbf) maximum per individual 
connector. This acceptable maximum value of 
push-pull force may vary depending on the 
mounting and operating conditions.

 

 
 
 
 
 
 
 
 
 

 
Conclusion: 
 

This application note gives the main 
recommendations regarding the mounting of SP4 
modules. Applying these instructions will help 
decreasing the mechanical stress both on PCB 
and power module and therefore will ensure long 
term operation of the system. Mounting 
instructions to the heat sink must also be 
followed to achieve the lowest thermal resistance 
from the power chips down to the cooler. All 
these operations are essential to guarantee the 
best system reliability.  

 

SP4  POWER MODULE 

Heat sink

Spacer 

Spacer 

PCB 

18

±0.2

 mm  

Содержание SP4

Страница 1: ... 1 6 mm 0 063 thick PCB use a plastite screw 6 mm 0 25 long The maximum mounting torque is 0 6Nm 5 lbf in In any case the customer must check the integrity of the plastic post after screwing fig 2 example of plastite screw The second step consists of soldering all electrical pins of the power module to the PCB Wave soldering or manual soldering processes are recommended to solder the signal and po...

Страница 2: ... M5 The screw length must be at least 12 mm 0 5 First lightly tighten the two mounting screws Tighten alternatively the screws until their final torque value is reached 4 7 N m max or 3 5 lbf ft It is recommended to use a screwdriver with controlled torque for this operation If possible screws can be tightened again after three hours The quantity of thermal grease is correct when a small amount of...

Страница 3: ...ter removal from heat sink 3 Hole diameters in the PCB 3 1 Top view Fig 5 pad and hole diameters in millimeters SP4 pinout can change according to the configuration full bridge boost chopper Each module datasheet has specific hole location information Hole 2 9 0 1 4x hole 1 5 0 1 pad 2 8 0 1 Hole 12 7 0 1 2x Heat sink PCB ...

Страница 4: ...le mounting screws fig 6 Power module assembly on heat sink and PCB 4 Mounting instructions if using a large PCB If a large PCB is used additional spacers between the PCB and the heat sink are necessary It is recommended to keep a distance of at least 5 cm between the power module and the spacers see fig 7 The spacers must have the same height as the plastic posts 17 mm 0 5 fig 7 Spacers used on l...

Страница 5: ...nnection push pull forces When the PCB is mounted onto the power module and the terminals soldered to it some mechanical forces may be applied to the terminals Such push or pull forces must not exceed 10N 2 25lbf maximum per individual connector This acceptable maximum value of push pull force may vary depending on the mounting and operating conditions Conclusion This application note gives the ma...

Отзывы: