Manufacturing Test
UG0209 User Guide Revision 7.1
55
The following window should appear on the terminal.
Figure 43 •
Manufacturing Test Menu
Note:
If this message does not appear, try pressing SW8 again. If the above message still does not appear,
refer to the
page 50 and check to see that the terminal is set up correctly.
Note:
The latest revision of SmartFusion Evaluation kit does not contain a OLED display.For more information,
see
PCN 1207: New Revisions of Hardware Kits (A2F-EVAL-KIT, A2F500-DEV-KIT, A3PE-STARTER-
and
CN1418A: Addendum A - Designing without OLED Display on Kits