
Warning
Risk of explosion!
Do not smoke, cause sparks or use a naked flame
in the vicinity of batteries.
Arcing can injure the operator or damage the
battery connector.
Ensure that the charging parameters have been
set correctly according to the battery
manufacturer’s specification.
Do not use the battery if the battery monitoring unit
or its cabling are damaged.
Use insulated tools designed for working on
batteries.
Only perform charging in a well
ventilated environment.
Acceptance
On delivery, visually check the unit for signs of
physical damage.
Check that delivered parts correspond with the
consignment note. Contact your supplier if
anything is missing, see
.
Description
Access™ BMU
See Fig. 2
1. Indication of high battery temperature (red)
2.
3. Indication for the specified time and date
(green)
4. Indication of the network status (green)
5.
6. Magnetic switch network management
Installation
Warning
Electrolyte is corrosive!
If electrolyte comes into contact with the eye,
damage can occur very quickly.
Rinse the eye immediately and thoroughly for at
least 10 minutes, seek medical attention.
Wear protective equipment such as safety glasses
and gloves to avoid contact with the electrolyte.
Note:
Installation may only be performed by qualified
installers.
Follow the battery supplier’s instructions for
handling batteries.
Access™ BMU is solely designed for use with
lead-acid batteries up to 96 V nominal DC voltage.
Consult the manufacturer regarding all other
usage.
Ensure that the Access™ BMU is installed by a
qualified installer in accordance with the
instructions.
Access™ BMU must be well protected against
mechanical damage during daily use, servicing
and maintenance.
Instructions
A threaded insert must be installed to connect
Access™ BMU on the lead terminals of the battery
and cells.
Installation of the threaded inserts
1. Drill a 5.5 mm (0.219 inch) hole in the
appropriate lead terminal. The depth of the hole
must be at least 7.7 mm (0.302 inch).
2. Knock the supplied threaded insert into the
hole.
Now secure the cable lug, use the supplied
washers and screws.
Installation of BMU
1. Locate the battery’s two midmost cells.
The current sensor must be attach between
these cells.
Example: On a 24 V battery it is cells 6 and 7.
4
Содержание Access BMU PRO UL
Страница 2: ......