MicroNet SP616DB Скачать руководство пользователя страница 4

Installation 

Preparing the Site 

Select the site that meets the following requirements: 
 

Characteristic Requirement 

Temperature 32 to 104˚F (0 to 40˚C) 

Humidity 

Maximum relative humidity of 90%, non-condensing 

Condition 

At least 1.8 meters (6 feet) to the nearest source of electromagnetic noise 

Ventilation 

Minimum 3 inches (0.25 feet) of clearance around the ventilation openings 

Power Outlet Within 1.8 meters (6 feet) to the switch 

 

Table 2: SP616DB / SP624DB Operating Requirements 

 

Settling the Switch 

z

 

Mounted to 19-inch standard rack 

Locate the accessories provided in the product package. Use the rack-mount brackets and 
screws to install the switch into any EIA 19” standard rack. 
Step 1: Attach the brackets to each side of the chassis. 
Step 2: Apply the screws to each side and secure them tightly. 
Step 3: Carefully position the switch into the rack. 
Step 4: Align the brackets to the side holes on the rack and use rack screws to secure the 
chassis with the rack. 
Step 5: Proceed to the “Connecting to Power” section.     

 

z

 

Desktop or any flat surface 

The switch can sit on desktop or any flat surface with adequate space and ventilation. If you 
want to place it onto a shelf, make sure the shelf can withstand the weight of the switch. 
Step 1: Simply put the switch on the desired place. 
Step 2: Ensure the switch receives good ventilation. 
Step 3: Proceed to the “Connecting to Power” section. 
 

Installing the Module (optional) 

Consult the following illustrations for installation. 

 

                           

 

 

Figure 3: Removal of cover plate                    Figure 4: Fiber module being installed 

 

Step 1: Make sure the power is switched off. The module is not hot-swappable. 

L

 

It may cause electric shock or any possible damage to the switch if the power is not 

switched off.

 

 

4

Содержание SP616DB

Страница 1: ...User s Manual EtherFast 10 100M Smart Switch Model No SP616DB SP624DB http www micronet info...

Страница 2: ...ional fiber optic module z Provide one web based console port z Provide 2K SP616DB 10K SP624DB MAC address and 2M SP616DB 1 5M SP624DB buffer memory z Provide 16 SP616DB or 24 SP624DB port based VLAN...

Страница 3: ...EDs Label Status Indication On Power is feeding in Power is switched off POWER Off Improper connection On A valid network connection LNK stands for LINK LNK Off No connection Flashing Transmitting or...

Страница 4: ...ws to each side and secure them tightly Step 3 Carefully position the switch into the rack Step 4 Align the brackets to the side holes on the rack and use rack screws to secure the chassis with the ra...

Страница 5: ...ocate the provided AC power cord Step 1 Connect the AC power cord to the receptacle at the back of the switch Step 2 Attach the plug into a standard AC outlet with a voltage ranging from 100 to 240 VA...

Страница 6: ...and manage the switch remotely from web browser 1 Connect UTP STP cable to SP616DB SP624DB s console port Figure 5 Connect directly to PC Figure 6 Connect to PC via another switch 2 In the web browser...

Страница 7: ...ease restart your Computer once the Switch Name is replaced and saved under Save Configuration by the new name Note only a z A Z 0 9 under line Space can be acceptable totally can not exceed 16 charac...

Страница 8: ...button to or not to refresh back to the last saved settings of the ports Note it is recommended to change the Refresh On button to Refresh Off while you change the settings of the ports The Refresh On...

Страница 9: ...to the VLAN groups z Apply Click the Apply button and apply the new settings of the VLAN groups Note all Ports have to be selected to one of the VLAN Groups those Port Ports were not selected will be...

Страница 10: ...Apply Click the Apply button and apply the new settings of the Trunk Groups SP624D Figure 14 Trunk of SP624DB z Trunk Group 1 Click and choose any four ports to be added into the Trunk Group 1 z Trun...

Страница 11: ...ta you have changed since the last Save operation Without clicking Ok button the switch does not save any changes you may have made Load Default Figure 16 Load Default z Click Load Default z Click the...

Страница 12: ...nsion 440 207 44 mm rack mount size Weight SP616DB 1 94 kg SP624DB 2 07 kg Power Input 100 240 VAC 50 60 Hz Input Fuse SP616DB 3 3VDC 2 5A SP624DB 3 3VDC 5A 5V 1A Power Consumption SP616DB 8 25W Max S...

Отзывы: