Gemini VII
Introduction
239-42828-01 - Dec 2012
9-1
9. TROUBLESHOOTING AND MAINTENANCE
Introduction
The analyzer has been designed to provide efficient and continuous service; however, certain mainte-
nance procedures should be followed to obtain the best results over the longest period of time. This
chapter includes maintenance and calibration procedures.
Troubleshooting
Most operational problems are caused by:
• Leaks (commonly around the sample tube O-ring at the analysis port)
• Sample weighing errors
• Use of too much analysis bath fluid in the Dewar at the start of an analysis
• Entry of incorrect system volume for analysis
• Impure gas supply
When unexpected analysis results occur, check the above first. Some common operational problems
that are not indicated on the screen and their respective causes and solutions are provided in the fol-
lowing table:6
What Happened
Why
What To Do
Specified pressure not
reached.
Sample or balance tube not
properly attached.
Reattach sample and balance
tubes. Ensure both are securely
attached to ports. Replace O-
rings if defective. Refer to
Replacing Port Filter (Frit)
and O-ring
Leak in gas line.
Perform the Adsorptive and
Helium Line tests to determine if
a leak exists. Refer to
.
Содержание Gemini VII 2390a
Страница 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Страница 4: ......
Страница 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Страница 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Страница 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Страница 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Страница 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Страница 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Страница 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Страница 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Страница 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Страница 264: ......
Страница 266: ......
Страница 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Страница 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Страница 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Страница 373: ...OPERATOR MANUAL Smart VacPrep Operator Manual Nov 2013 SMART VACPREP INTELLIGENT VACUUM SAMPLE PREPARATION SYSTEM...
Страница 380: ...Contact Us vi Smart VacPrep Operator Manual...
Страница 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Страница 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...