4.Installation Instructions
The radar must be installed on the surface of gate box
body and the radar surface with LED indicators must be
perpedicular to the lane (vehicle access) direction. The
installation must follow the instructions below:
Step1.Choice of radar mounting location.
the radar LED indicator must be facing down which
refers in Figure 2. The installation position of radar must
be 200-300mm away from the barrier gate and
550-750mm higher than the ground.
Содержание ITS-AX2
Страница 10: ...Figure 1 Appearance and Size...
Страница 14: ...Figure 4 Installation Demonstration...
Страница 20: ...Other detailed operation can be found in the product manual and application manual...