Page 63
Operation
English
capaNCDT 6100
5.
Operation
5.1
Starting Up
Connect the display/output devices through the signal output socket, see Chap.
, before connecting
the device to the power supply and switching on the power supply.
i
Allow the measuring system to warm up for about one minute before the first measurement or calibrati-
on.
5.2
Basic Settings
The gain and zero point of the measuring channel are adjusted with the ’gain’ and ’zero’ trimmer potentiome-
ters, see
, (setting range approx. 20 turns per potentiometer).
The end settings at the left and right stops are recogniceable by a slight click.
Gain
Sensor/
Synchronization
Zero
Power/
Output
Fig. 7 Signal conditioning board with trimmer potentiometers
Содержание 4350006.71
Страница 1: ...thicknessCONTROL MTS 8201 LLT O Frame Non contact thickness measurement Operating Instructions ...
Страница 12: ...Page 12 Laser Safety thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 62: ...Page 62 Instruction Manual Software thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 64: ...Page 64 Pneumatic Plan thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 70: ...Page 70 Declaration of Incorporation thicknessCONTROL MTS 8201 LLT 4350006 71 ...
Страница 95: ...Operating Instructions scanCONTROL 29xx ...
Страница 99: ...scanCONTROL 29xx Appendix A 1 Accessories 60 A 1 1 Recommended Accessories 60 A 1 2 Optional Accessories 61 ...
Страница 100: ......
Страница 135: ...Page 41 Operation of the Sensor with a PC scanCONTROL 29xx Fig 24 Predefined measuring fields ...
Страница 193: ......
Страница 194: ......
Страница 229: ......