28
Operator's Manual
MAINTENANCE CHART
PROCEDURE
DAILY
3 MONTHS
6 MONTHS
9 MONTHS
2 MONTHS
Check engine oil level
X
Change engine oil*****
X
X
X
X
Check water pump oil level
X
Change water pump oil **
X
X
X
X
Oil leak inspection
X
Fuel leak inspection
X
Water leak inspection
X
Hose inspection
X
Water Inlet Screen Inspection
X
Check fuel filter
X
X
X
X
Replace fuel filter
X
X
Inspect belts
X
X
X
X
Replace high pressure nozzle***
X
X
X
X
Inspect fuel pump filter*
X
Replace fuel nozzle*
X
Check burner air adjustment
X
X
X
X
Check burner electrodes*
X
Test water pressure*
X
X
X
X
Test fuel pressure*
X
X
X
X
Test water temperature*
X
X
X
X
Descale coil****
X
*
Must be performed by an authorized service technician.
**
The pump oil must be changed after the first 50 hours of operation and every 250 hours or 3 months,
whichever comes first.
***
High pressure nozzle should be replaced whenever pressure is less than 85%.
****
Scale buildup will vary with mineral content in the water and amount of usage. Descaling can range from
weekly to yearly maintenance.
*****
The engine oil must be changed after the first 8 hours of operation and every 50 hours or 3 months, which-
ever comes first.
Содержание HS SERIES
Страница 10: ...10 Operator s Manual HS FEATURES HS FEATURES 032905 RZ ...
Страница 40: ...40 Manuel de l utilisateur CARACTERISTIQUES du hs HS FEATURES 032905 RZ ...
Страница 70: ...70 Manual del operador CARACTERÍSTICAS HS FEATURES 032905 RZ ...
Страница 90: ...90 Manual del operador NOTA ...
Страница 91: ...Manual del operador 91 NOTA ...