
11
79D0004
Lo-Rider Designer Vent Free Fireboxes
peninsula unit (lpf36) installation
1. Attach nailing flanges in desired position.
Figure 16
2. Slide firebox into prepared framing or position firebox
in its final position and frame later.
3. level and plumb firebox by checking edges of firebox.
Shim if necessary.
4. Attach nailing flanges to studs.
Figure 15
5. Install canopy.
Refer to Page 15 for canopy installa-
tion.
fireplaCe installation
Figure 15 -
Location of Nailing Flanges and Floor Screws
FP2327
nailing flange
Nailing Flanges
FP2327
Figure 16 -
Nailing Flanges with Different Drywall Depths
FP2328
nail flang drywall
5/8 Drywall Position
1/2 Drywall Position
FP2328