![MHG Heating GZ 2 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/mhg-heating/gz-2/gz-2_installation-operation-and-maintenance-instructions-manual_1783421024.webp)
Installation-Operation-Maintenance
GZ 2 - GZ 4 / 100 - 1450 kW
24
Guarantee
MHG gas burners should work perfectly after beings installed
and started by a qualified heating engineer, and when used for
combustion of the gas types stipulated in DVGW paper G 250
certified for the particular gas burners.
The guarantee period lasts for 24 months after first start-up and
not more than 27 months after the date of dispatch. Please
consult the burner documents for details.
For details please consult the burner card.
Spare parts
When replacing parts, only use original spare parts from
MHG. Some components are specially designed and manu-
factured for MHG burners.
When ordering spare parts, please always state the burner
number.
All dimensions in mm.
Technical details and components subject to change without
prior notice.