background image

Refer to the highlighted areas to see where you’ll be inserting bolts 

(F) next.

Placing lock washer (E) on top of washer (D), fasten bolt (F) on all 

four holes using allen key (H).

step 5:

step 6:

Voila! Your table is now assembled and secure! 

F

E

D

H

Содержание MH-TB-891

Страница 1: ...estimated assembly time 15 00 people required 2 or more MH TB 891 892 898 1...

Страница 2: ...c To prevent damage to product use the clean side of package carton or rug as working surface for assembly In the event of missing or damaged parts delivery problems etc please reach out to our team W...

Страница 3: ...ith a soft and dry cloth To protect finish avoid use of abrasive cleaners Wipe up spills immediately Please While assembling the product tighten the bolts up to 50 Once all parts are in place only the...

Страница 4: ...B Table Legs x2 A Tabletop x1 C Rod x1 product parts 4...

Страница 5: ...D Washer 18mmx 8mm x4 E Lock Washer 15mmx 8mm x4 F Bolt M6x20mm x4 G Bolt M6x10mm x12 H Allen key 4mmx 110mm x1 what s included 5...

Страница 6: ...h going in This may be a tricky part but nothing too overwhelming Just follow these steps to the T and the outcome will be worth it 6 While assembling the product tighten the bolts up to 50 Once all p...

Страница 7: ...nsert table leg B into the preinstalled rods on tabletop A Slide rod C onto the table leg B as shown in the image Next insert the other table leg B into rod C and the preinstalled rods on the tabletop...

Страница 8: ...Using bolts G and allen key H secure them in place step 4 8 H G Check out the holes on rod C and the preinstalled rods as highlighted in the image That s where you ll be inserting bolts G step 3...

Страница 9: ...lighted areas to see where you ll be inserting bolts F next Placing lock washer E on top of washer D fasten bolt F on all four holes using allen key H step 5 step 6 Voila Your table is now assembled a...

Страница 10: ......

Отзывы: