1-800-325-9103
Formula Mixer Check List
- 3 -
www.meyermfg.com
2.0 PRE-DELIVERY & DELIVERY CHECK LIST
This Pre-Delivery & Delivery Check List must be gone through by the Selling Party and the Customer to validate the
Owner’s Registration Form.
Meyer Manufacturing Corporation
Phone: 715-654-5132 • Toll-Free: 1-800-325-9103 • P.O. Box 405 • Dorchester, WI 54425
PB Mixer Check List
All shields and guards are in place and securely
fastened.
All PTO shields turn freely.
All bolts and other fasteners are secure and tight.
All mechanisms operate trouble free.
All grease fittings have been lubricated, gear
boxes filled to proper levels, and all roller chains
are oiled. See “Lubrication” section of this
manual.
All decals are in place and legible.
All stop/tail/turn lights work properly.
PRE-DELIVERY CHECK LIST
After the New Meyer Mixer has been completely set-up,
check to be certain it is in correct running order before
delivering it to the customer.
The following is a list of points to inspect:
Check off each item as you have made the proper
adjustments and found the item operating
satisfactorily. Any adjustments made, MUST be
according to specifications defined in this manual.
DELIVERY CHECK LIST
The following check list is an important reminder of
valuable information that MUST be passed on to the
customer at the time the unit is delivered.
Check off each item as you explain it to the
customer.
Explain to the customer that pre-delivery check
list was fully completed.
Give customer the Owner & Operator’s Manual.
Instruct to read and completely understand its
contents BEFORE attempting to operate the
mixer.
Explain and review with customer the New Meyer
mixer manufacturer’s warranty.
Show the customer where to find the serial
number on the implement.
Explain and review with the customer “Safety
Precautions” section of this manual.
Explain and review with customer the proper
“Start-up and Operating Procedures” sections of
this manual.
Explain and review with customer the
recommended loading and unloading
procedures.
Demonstrate the start-up and shutdown controls.
Explain that regular lubrication and proper
adjustments are required for continued proper
operation and long life of the mixer. Review with
the customer the “Lubrication” and “Adjustments”
sections of this manual.
Fully complete this “PRE-DELIVERY &
DELIVERY CHECK LIST” with the customer.
Содержание F585 2018
Страница 10: ...Meyer Manufacturing Corporation 10 PB MIXER TR MECH ...
Страница 12: ...Meyer Manufacturing Corporation 12 PB MIXER TR MECH ...
Страница 44: ...Meyer Manufacturing Corporation 44 PB MIXER TR MECH ...
Страница 46: ...Meyer Manufacturing Corporation 46 PB MIXER TR MECH SCALE SYSTEM PBMTR 007 4 7 8 6 5 6 5 6 9 1 2 6 5 5 10 3 ...
Страница 57: ...1 800 325 9103 PB MIXER TR MECH 57 www meyermfg com ...
Страница 58: ...Meyer Manufacturing Corporation 58 PB MIXER TR MECH DOOR FM 100 8 3 1 2 6 11 9 5 4 7 10 ...
Страница 62: ...Meyer Manufacturing Corporation 62 PB MIXER TR MECH AUGER PB 19_004 6 1 2 7 8 3 5 9 4 10 ...
Страница 66: ...Meyer Manufacturing Corporation 66 PB MIXER TR MECH RIGHT SIDE PTO GEARBOX DRIVELINE MOUNT 7 1 8 6 5 2 3 4 8 ...
Страница 68: ...Meyer Manufacturing Corporation 68 PB MIXER TR MECH LEFT SIDE PTO GEARBOX DRIVELINE MOUNT 7 8 6 5 3 9 4 8 2 1 ...
Страница 82: ...Meyer Manufacturing Corporation 82 PB MIXER TR MECH SIDE DISCHARGE SLIDE TRAY FM 125A 2 1 4 5 6 7 3 ...
Страница 86: ...Meyer Manufacturing Corporation 86 PB MIXER TR MECH REMOTE SCALE MOUNT FM 255 A 4 3 5 6 1 2 8 8 6 7 9 8 10 ...
Страница 90: ...Meyer Manufacturing Corporation 90 PB MIXER TR MECH ...