Meyer Manufacturing Corporation
- 22 -
PB-FATBOY
6.5 SET UP
Once the forage box is ready to be set up, follow the steps listed below:
1.
Position forage box on level ground/surface.
2.
Unfold the suspension height indicator (Item 1).
3.
Turn the control box selector knob to LEVELING (Item 2).
4.
Lift the forage box suspension using the tractors hydraulics.
5.
Stop lifting the forage box once the suspension height indicator (Item 3) is allowed to become vertical.
6.
Turn the control box selector knob to RUN (Item 4).
7.
Fold the suspension height indicator into its storage location.
Shutoff and lockout power before performing machine service,
adjusting, maintaining, or clearing an obstruction from this machine.
Refer to section 5.3 SHUTOFF & LOCKOUT POWER.
DO NOT allow anyone to operate, service, inspect or otherwise handle
this forage box until all operators have read and understand all of the
instructional materials in this Operator’s And Parts Manual and have
been properly trained in its intended usage.
Before operating the forage box, look in all directions and make sure
no bystanders, especially small children are in the work area.
3
1
4
2
Содержание BOSS RT FATBOY 1026RT RR
Страница 10: ...Meyer Manufacturing Corporation 10 PB FATBOY ...
Страница 32: ...Meyer Manufacturing Corporation 32 PB FATBOY ...
Страница 40: ...Meyer Manufacturing Corporation 40 PB FATBOY ...
Страница 41: ...NOTES ...
Страница 42: ...NOTES ...