20
Analysis. Typical tasks and solutions
imum interframe gap is sent to DUT
(fig. 5.1
). Then, the analyzer
counts the frames that are transmitted by the DUT. If the fewer frames
are received than transmitted, the interframe gap is increased and the
test reruns.
Note:
relation between interframe gap and load is inverse,
thus, the bigger gap value is, the lesser the load is.
.
.
.
.
1
2
Figure 5.1. Throughput
2.
Latency. This test allows to analyze the time during which a frame will
be transmitted from the source to destination and then back to source.
The latency is one of the major parameters for the real-time services
operation.
When analyzing the latency, the throughput for DUT at each of the
listed frame sizes is determined first. Then, a stream of frames at a par-
ticular frame size is sent through the DUT at the determined through-
put rate to a specific destination. The minimum duration of the stream
transmission is set as 120 seconds (user can specify alternative value
in the range of 1–2886 seconds). In a specific time, an identifying tag
is included into one frame with the type of tag being implementation
dependent. The time at which this frame is fully transmitted is record-
ed as a
Ta
time stamp value. The receiver port of the analyzer then
recognizes the tag information in the frame stream and records the time
at which the tagged frame was received (
Tb
value).
The latency value is the difference between time stamp
Tb
and time
stamp
Ta
values.
2
For the current test and tests described further, all steps are performed automatically.
3
At the figures, only one of connection type is shown. For other possible connection
schemes please refer to the see section 5.3.
Bercut-ET. Operations manual
Содержание Bercut-ET
Страница 1: ...Ethernet Gigabit Ethernet Tester Analyzer Bercut ET Operations manual Version 1 1 0 2009 Metrotek ...
Страница 6: ...6 Bercut ET Operations manual ...
Страница 8: ...8 Bercut ET Operations manual ...
Страница 10: ...10 Bercut ET Operations manual ...
Страница 12: ...12 Bercut ET Operations manual ...
Страница 18: ...18 Bercut ET Operations manual ...
Страница 65: ...5 12 Testing TCP IP 65 Figure 5 68 Response example Bercut ET Operations manual ...
Страница 96: ...96 Bercut ET Operations manual ...
Страница 102: ...102 Bercut ET Operations manual ...
Страница 114: ...114 Bercut ET Operations manual ...