Metro DataVac MetroMaxQ ESD Shelving Скачать руководство пользователя страница 1

®

ASSEMBLY

INSTRUCTIONS

ASSEMBLY

INSTRUCTIONS

For MetroMaxQ ESD Shelving

L01-287

Rev. A 12/00

Information and specifications are subject to change

without notice. Please confirm at time of order.

SHELVING

®

GROUNDING
INSTRUCTIONS

For all mobile MetroMax Q ESD
applications, 

conductive casters

and/or a grounding cable

 (Catalog

No. ASK16S) must be used. To insure
conductivity, grounding cable must
be attached to the bottom shelf
center snake as shown below.

InterMetro Industries Corporation

North Washington Street, Wilkes-Barre, PA 18705

For Product Information Call:

 1-800-433-2232

Visit Our Web Site:

 www.metro.com

Unlock opposite corner releases of
the shelf above or below the shelf
being adjusted.

1.

 Construct the ESD shelving unit

following the steps listed in the
accompanying instruction sheet.

2.

 Should you experience difficulty

adjusting a MetroMax Q ESD
shelf, follow the alternate method
listed below:

a.

 Please unload all items from the

shelf to be adjusted. Also, remove
all items from either the shelf
immediately above or below the
shelf being moved.

b.

 Unlock 

opposite

 corner

releases of the shelf 

above or

below

 the shelf being adjusted as

shown in the drawing below.

c.

 Adjust the shelf to the desired

location. Be sure to 

RE-LOCK ALL

CORNER RELEASES.

3.

 For grounding and cleaning

instructions, see below.

To adjust shelf

➡➡

CLEANING
INSTRUCTIONS

Mats can be cleaned using a 70%
solution of Isopropyl alcohol to
remove dust and oils.

Correct

Incorrect

Отзывы: