Electrical Installation Safety Trainer
AD 1 - MI 3399
104
For the standard measurement (sometimes very long) prolongation tests are used.
In this case the resistance of measuring leads must be subtracted from the result
(this feature is usually integrated in installation testers).
Problem of parallel paths must be considered.
Figure 2-44:
Standard continuity test
2.7.2 Exercises
2.7.2.1 Exercise No. 2.7-1: Measuring continuity in a TN/TT system
Measuring procedure
1
To measure the insulation resistance select first the
R
200
function in the
continuity
(RLOW)
section. This is a DC type of measurement.
2
Set the minimum allowed insulation resistance by clicking in the bottom left dark
grey corner.
Содержание MI 3399
Страница 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Страница 28: ...Electrical Installation Safety Trainer AD 1 MI 3399 28 AD 1 MI 3399 EIS Electrical Installation Safety Trainer...
Страница 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Страница 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Страница 122: ...Power and Voltage Quality Trainer AD 2 MI 3399 122 AD 2 MI 3399 PQA Power and Voltage Quality Trainer...
Страница 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Страница 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Страница 205: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 205 AD 3 MI 3399 PAT Appliances Machines Safety Trainer...
Страница 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Страница 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...