Power Network Application Trainer
– Power generator, transformer, coils
171
Figure 98-3: Winding resistance measurement of three-phase transformer
Warning:
Please do not disconnect test leads during testing. Wait until results are shown
on the screen and discharge is finished. Removing clamps prior that can result
in high voltage spike, potentially hazardous electric shock and a permanent
damage of testing equipment.
Notes:
Consider displayed warnings when starting the measurement!
If error notification appears on screen at the beginning of the measurement (for
example V(H1-H2) > 10.0V), transformer might be supplied with auxiliary power
source. Inspect what might be the cause for that error, eliminate the fault and try
again.
If error notification appears on screen during the measurement (for example
I(X1-X2) < 1 mA), at least one clip indicated in the message is disconnected or
too high winding resistance is detected. Inspect what might be the cause for that
error, eliminate the fault and try again.
Содержание MI 3298
Страница 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Страница 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Страница 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Страница 228: ...MI 3290 Earth Analyser 228 ...
Страница 229: ...MI 3280 Digital Transformer Analyser 229 ...
Страница 230: ...MI 3280 Digital Transformer Analyser 230 ...
Страница 231: ...MI 3250 MicroOhm 10A 231 ...
Страница 232: ...MI 3205 TeraOhmXA 5kV 232 ...