9. Preliminary work

Before the installation of the meter please make sure that the following steps 
has been observed:

1. 

Remove the plastic cover sheets the inlet and outlet of the meter.

2.

 Inspect the meter for completeness (e. g. plugs, provided oil volume) 

  and for absence of any transport damages.

3. 

Clean the flange surfaces (e. g. with petroleum).

4. 

Check by blowing into the meter that turbine rotor rotates easily and stops smoothly.

5. 

Prior to the meter’s installation check that no contaminations, condensate, dirt and debris  

  are in the pipe. Especially the cleaning of elbows in vertical installations is important 
  to prevent damage of the meter by contaminations, dirt and debris passing. A cone-shaped  
  start-up sieve may be installed for initial operation. After 4-6 weeks it should be removed 
  to avoid perturbations of the flow profile with resulting decrease of the accuracy.

6. 

Make sure that there is no intrusion of the sealing element into the pipe during installation  

  and operation (concentric mounting).

7. 

Check that in addition to the meter-length there is enough installation space for 

  the two seals between inlet and outlet flanges.

8. 

The meter must be installed stress-free. Therefore in addition to point 7 observe strictly the  

  proper alignment of the Quantometer’s inlet to outlet axis with the connecting piping axis.

Necessary equipment fort he meter installation:

1.

Suitable and certified gaskets:

  •

 

Dimensions according DIN EN 1514-1 or DIN 2690

2. 

Screws according DIN ISO 4014 and ASME B 1.1

3.

 

Nuts according DIN EN ISO 4032 and ASME B 1.1

 

DN 

Pressure 

                        Flanges according ANSI B 16.5 

 

[mm] 

ANSI Class                    

Stud bolts with continuous thread and nuts

 

 

 

Min. Operating 

Number 

Strength 

Strength

 

 

 

temperatur of 

of screws 

class 

class

 

 

 the 

screws   screws 

screws

 

 

 

and nuts

  

 

25 

150 

- 25°C 

4 x M12 

ASTM A 193 

ASTM A 194

 

    

Grade 

B7 

Grade 

2H

 

50 

150 

- 25°C 

4 x M16 

ASTM A 193 

ASTM A 194

 

    

Grade 

B7 

Grade 

2H

 

80 

150 

- 25°C 

8 x M16 

ASTM A 193 

ASTM A 194

 

    

Grade 

B7 

Grade 

2H

 

100 

150 

- 25°C 

8 x M16 

ASTM A 193 

ASTM A 194

 

    

Grade 

B7 

Grade 

2H

      150 

150 

- 25°C 

8 x M20 

ASTM A 193 

ASTM A 194

 

 

 

    

Grade 

B7 

Grade 

2H

Содержание MQM

Страница 1: ...living gas Metreg Technologies GmbH MQM Quantometers Manual Quantometers...

Страница 2: ...www metreg technologies de MQM_Manual_EN_16 01 2015 2014 Metreg Technologies GmbH Design www reidelsoltaugrafikdesign de All rights reserved Subject to technical changes...

Страница 3: ...5 MQM Quantometers Manual Quantometers...

Страница 4: ...stallation 8 9 8 Mounting Position Direction of Flow 9 9 Preliminary work 10 11 10 Lubrication and Maintenance of the MQM Quantometer 12 11 Maintenance of MQM Quantometers 13 12 Commissioning of the M...

Страница 5: ...ral gas town gas propane butane and others purified and dried biogas as well as other inert non aggressive and non explosive gases and gas mixtures The permissible operating pressure range reaches up...

Страница 6: ...request The MQM Quantometer cannot be used for Oxygen Acetylene and other aggressive gases as well as for explosive gases and gas mixtures The meter should not be used in applications with the presen...

Страница 7: ...um Protection class IP 65 Pulse generators LF pulse generator 1 LF reed contact add 1 LF as option Contact type make contact normally open Max contact load 10 W Max switching voltage 50 VDC 200 VDC Ma...

Страница 8: ...e compensator can effectively damp down this kind of disturbance Drastic changes in the gas flow as well as strongly pulsating flow will increase the measuring error They arise for example during freq...

Страница 9: ...xplosive gases and gas mixtures 8 Mounting Position Direction of Flow There are two positions of installation possible for the turbine gas meter Horizontal installation or vertical installation Figure...

Страница 10: ...element into the pipe during installation and operation concentric mounting 7 Check that in addition to the meter length there is enough installation space for the two seals between inlet and outlet f...

Страница 11: ...16 25CrMo4 25CrMo4 150 16 40 C 8 x M20 25CrMo4 25CrMo4 During Installation of the meter has to been checked 1 The meter is mounted in the right flow direction 2 The meter is installed gas tight 3 The...

Страница 12: ...Shell Morlina S2 BL 10 c Fill in the oil before commissioning the meter and after the correct installation of the meter described in chapter 7 and 8 d Fill an adequate quantity of oil in the supply ta...

Страница 13: ...leakage test of the connections 1 Open slowly the upstream valve fig 2 and fig 3 to pressurize the pipe until operation pressure is achieved 2 The rate of pressure increase shall not exceed 350 mbar s...

Страница 14: ...the MQM Quantometer As an option one high frequency HF pulse generator can be installed onto the meter The function of the HF pulser is the determination of the actual gas flow in high resolution The...

Страница 15: ...aluminium The connection of the LF pulser unit is designed via a plug connection 1 LF pulser for flow measurement o Pin 5 Blue o Pin 6 Grey o Pin 7 Pink 2 LF pulser for flow measurement option o Pin...

Страница 16: ...metallic materials are not allowed Figure 8 Location of the pressure test point 16 Temperature Measuring Point There is one temperature test point as shown in figure 9 The temperature tap is marked wi...

Страница 17: ...ful during loading and transportation to or from the measuring point Some requirements for transportation and storage of the meter are Das Messger t ist an beiden Flanschen mit Schutzfolien versehen T...

Страница 18: ...19 Annex A CE Declaration of Conformity 18 Metreg Technologies GmbH...

Страница 19: ...auf den Impulsgebern LF pulse generator Reed switch Connection only magnetically to intrinsically safe circuits triggered when installed in hazardous area HF Pulse generator Proximity switch PTB 01 A...

Страница 20: ...www metreg technologies de Your contacts Metreg Technologies GmbH Tr nkeweg 9 15517 F rstenwalde Germany Telephone 49 0 3361 733900 0 Fax 49 0 3361 733900 1 info metreg technologies de...

Отзывы: