The machine is designed for steel processing and not for 
processing flammable or harmful substances. The custo

-

mer is responsible for the choice of the material to be 
processed.

It must also be ensured that the safety of nearby opera

-

ting personnel is ensured.

The material should meet the following requirements:

- Dry and clean, free of oil.

- The diameter must correspond to the specificati

-

ons.

- The material should have a degree of hardness th

-

roughout.

- Buying high quality material is advisable

- The surface of the areas to be bent should be 

smooth.

A complete bend with one pass is not possible. To get 
the desired radius, several passes are required. Tighter 
bends and full radii always require several passes.

In order to be able to remove a bent workpiece from the 
machine, the locking handle of the upper roller must be 
released and the upper roller must be removed from the 
guide.

Fig. 5: Locking uper roll

8.1 Work flow

Step 1: Before starting the machine, check the locking of 

the top roller.

Step 2: Check the parallelism of the rollers with a gauge 

and a spirit level.

Fig. 6: Check parallelism of rollers

Step 3: Clean the rollers and the workpiece.

Step 4: Perform Bending.

Step 5: Loosen the lock of the upper roller, fold out the 

upper roller and remove the workpiece. 

Step 6: Fold in the top roller and lock.

8.2 Setting the sheet thickness

The sheet thickness is set via the two rotary handles (1). 
By unscrewing the gap between roller 1 and 2 roll increa

-

ses, by screwing it decreases this. It is advantageous to 
insert the sheet only to then adjust the distance between 
the two rollers so that they rest against the sheet.

NOTE!

-  The safety devices as well as the protective covers 

must be functional.

NOTE!

It is important to thoroughly clean the rollers to avoid 
possible slippage of the profile due to grease resi

-

dues on the rollers.

Wearing safety gloves!

Wear safety shoes!

Wear protective clothing!

DANGER!

The unfolded top roller must not be overloaded by 
the workpiece.

Locking

Содержание RBM 305

Страница 1: ...Operating Instructions Plate rolling machine RBM 305 RBM 305 RBM 305...

Страница 2: ...3 1 1 Copyright 3 1 2 Customer service 3 1 3 Limitation of liability 3 2 Safety 3 2 1 Symbol explanation 3 2 2 Requirements to staff 4 2 3 Personal protective equipment 4 2 4 General safety regulatio...

Страница 3: ...ce and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these operat...

Страница 4: ...in works may only be performed by specialist per sonnel of the manufacturer Other personnel is not au thorized to perform these works Please contact our cus tomer service for the execution of all aris...

Страница 5: ...ne has various warning labels and safety markings that must be observed and followed The safety markings attached to the plate rolling ma chine must not be removed Damaged or missing safety markings c...

Страница 6: ...e carrier or dealer 5 2 Packaging All used packaging materials and packaging aids are re cyclable and should be taken to a materials recycling de pot to be disposed of The delivery packaging is made o...

Страница 7: ...ort as well as for ad justment and maintenance work The site must have good lighting Space Requirement The measure of the space requirement on the right side of the machine should be slightly larger t...

Страница 8: ...er sons Insufficiently qualified persons can not assess the risks involved in handling the bending machine and expose themselves and others to the risk of serious injury All work should only be carrie...

Страница 9: ...the guide Fig 5 Locking uper roll 8 1 Work flow Step 1 Before starting the machine check the locking of the top roller Step 2 Check the parallelism of the rollers with a gauge and a spirit level Fig...

Страница 10: ...ding and conical bending must be carried out ex tremely carefully It should be noted that a small radius is made by repeating the bending process several times Once too much bent this step can not be...

Страница 11: ...ensions Fig 13 Calculation of the workpiece dimensions Bending process Step 1 Before conical bending the sheet must be pre bent at the ends with parallel rolls Step 2 Then the machine has to be prepar...

Страница 12: ...e correct notch and turn the handle to shape it The remaining procedures and adjustments are identical to those of bending a sheet Fig 17 Bending of wires 9 Care maintenance and repair WARNING Never c...

Страница 13: ...tic parts or painted surfaces A surface release and consequential da mage may occur DANGER The rollers must not be lubricated or oiled You would allow slipping of the material and thus trigger no ben...

Страница 14: ...e following basic information for requests or orders of spare parts Type of device Item No Position No Year of construction Quantity Required mode of dispatch mail freight sea air express Address of d...

Страница 15: ...2 Spare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your authori...

Страница 16: ...mity according to Machinery Directive 2006 42 EC Annex 1 does not require this machine In the event of a modification of the machine not agreed with us this declaration shall lose its validity Product...

Страница 17: ...Notes RBM 305 Version 2 02 17 14 Notes...

Страница 18: ...www metallkraft de...

Отзывы: