
INSTRUCTION MANUAL
–
T229, T241 FRONT LOADER
47
5.6 End of Operation
After use:
−
check all bolt connections,
−
check the condition of hydraulic lines and quick couplers,
−
ensure that the hydraulic system is not leaking,
−
remove the work tool from the Loader,
−
leave the Loader in the idle position or remove it from the frame (Chapter 2.5),
−
protect the hydraulic lines against UV rays.
Any unauthorised changes in the setting of the two-section block valve
of the Loader invalidate the warranty and the manufacturer shall not be
responsible for any hazards or damage resulting from such changes.
WARNING
Содержание T229
Страница 2: ......
Страница 35: ...INSTRUCTION MANUAL T229 T241 FRONT LOADER 35 Figure 16 Adjusting the indicator 1 lock 2 support...
Страница 60: ...60 INSTRUCTION MANUAL T229 T241 FRONT LOADER NOTES...
Страница 61: ...INSTRUCTION MANUAL T229 T241 FRONT LOADER 61...
Страница 62: ...62 INSTRUCTION MANAL T229 T241 FRONT LOADER...
Страница 63: ......