METAL-FACH
Heating Technology
13
mechanical ventilation, activated periodically during fuel filling and slagging of boilers, ensuring a
minimum of 10 full air changes per hour;
●
natural lighting shall be provided in the boiler room, illuminating the boiler from the front, and the
window area shall be a minimum of 1/15 of the boiler room floor area; half of the windows shall be
operable; electrical lighting and an electrical outlet, not exceeding 24 V, shall also be provided in the
room;
●
there should be a drainage sump in the floor to allow cooling of the water and its capacity should be
equal to the water capacity of the largest boiler, but not more than 2 m
3
;
●
in the boiler room, the thermal pipes should be insulated;
●
The boiler position with the minimum required distances is shown in the boiler room diagram below.
Minimum distances for positioning the boiler in the boiler room
Содержание SEMAX OPTI
Страница 2: ......
Страница 30: ...METAL FACH Heating Technology 28...
Страница 36: ...METAL FACH Heating Technology 34...
Страница 38: ...METAL FACH Heating Technology 36...
Страница 40: ...METAL FACH Heating Technology 38...
Страница 47: ......