Quick Sheet for Operating the E-Sampler 

Smoke Particulate Monitor and  

Airsis Satellite Telemetry System 

 

BEFORE GOING TO THE FIELD 

 

Equipment List 

 

E-Sampler Smoke Particulate Monitor 

 

Tripod

 

 

Weatherproof power supply/battery charger

 

 

Gel cell battery

 

 

PM

2.5

 sharp cut cyclone 

 

 

TSP inlet (weather cap)

 

 

Airsis telemetry system

 

o

 

Power cord

 

o

 

Serial communication cable

 

o

 

Mounting hardware

 

 

Two-connection extension cord (if using line power)

 

 

Laptop (if downloading data)

 

 

Met One serial communication cable (if downloading data)

 

 

Miscellaneous tools.

 

 
Charging Batteries  

Charge the batteries for at least 1 day before use.  

 

 

 

E-Sampler –  

o

 

Connect the plug from the weatherproof power 

supply/battery charger to the appropriate connector on 

the bottom of the E-Sampler.   

o

 

Connect the power supply to line power.  Charge the E-

Sampler power supply for at least 24 hours.  

OR 

o

 

Charge the gel cell battery with a plug-in charger for 

12-volt gel cells. 

 

 

Charge the telemetry system by plugging the power cord 

from the system to line power.    

 

 

SITING THE E-SAMPLER AND  

TELEMETRY SYSTEM 

 

The E-Sampler and its telemetry system should be placed in 

an open area away from obstructions such as trees or 

buildings, and away from external pollution sources (road 

dust, industrial pollution, and so forth).  The telemetry antenna 

must have a clear view of the sky to transmit data.   

 

 

SETUP IN THE FIELD 

 

 

Remove the three pins from the tripod and unfold the legs 

until they are fully extended.  Replace the pins in the holes 

in the leg flanges. 

 

Attach the E-Sampler to the tripod by sliding the slot on the 

back of the E-Sampler over the mounting tab on the tripod.   

 

Attach the bottom of the E-Sampler to the tripod by sliding 

the ¼-inch bolt through the bottom flange and through the 

tripod.  Hand tighten the nut on the bolt. 

 

Attach the PM

2.5

 sharp cut cyclone to the inlet of the E-

Sampler. 

 

Attach the TSP inlet (weather cap) to the PM

2.5

 sharp cut 

cyclone.   

 

Attach the power supply/battery charger to the tripod. 

 

Attach the connector from the power supply to the bottom 

of the E-Sampler. 

 

Attach the telemetry system to the tripod, using the supplied 

hardware.  

 

Plug the communication cable from telemetry system to the 

appropriate connector on the bottom of the E-Sampler. 

 

Attach the power cord from the power supply and telemetry 

system to the extension cord and plug in the extension cord 

to line power. 

OR if using the gel cell battery 

  

 

Inside the E-Sampler, remove the battery cover plate. 

 

Connect the two-prong connector of the internal battery 

cable to the E-Sampler circuit board. 

 

Attach the RED (+) and BLACK (-) wires of the battery 

cable to the battery terminals. 

 

 

CHECKING SETTINGS ON THE E-SAMPLER 

 

The MENU/SELECT, ESC, left, right, up, and down arrows 

are used to traverse the screens on the E-Sampler. The blank 

white buttons under the screen are used to save or exit 

settings. Settings on the E-Sampler should have been set 

already.  The instrument stores these settings.  

 
Verifying SETUP settings

 

From the Main Screen: 

 

 

 

Press the 

MENU/SELECT

 button. 

 

 

 

 

Use the arrow buttons to move the cursor to SETUP.  Press 

MENU/SELECT

 

 

   ALARM CONTACT 
   RH HEATER CONTROL 
   ZERO MODE 
   SPAN MODE 
   BAUD RATE 
   STATION ID 
   ENGR UNITS 
 

 

 

>CLOCK 
 AVERAGE PERIOD 
 CONCENTRATION 
 SAMPLING MODE 

 OPERATE 
>SETUP 
 CALIBRATE 
 ALARM LOG 

08-JUL-2001 08:23:41 
  CONC:    UNIT OFF 
  FLOW:    0.0 LPM 
 TURN ON 