background image

Top shower

Movable 

shower head

Water fall

Foot 

massage

Steam 

generator

Nozzle

Nozzle

Nozzle

Nozzle

Switch 

valve

Cold/hot 

water switch

H

o

w

at

er

 c

o

n

n

ec

ti

o

n

(r

ed

 p

ip

e)

C

o

ld

 w

at

er

 c

o

n

n

ec

ti

o

n

(r

ed

 p

ip

e)

Switch 

valve

STEP

1

STEP

2

INSTALLATION

 

SKETCH

1
2

3
4

5
6
7

8

9

1

water pump switch

2

air regulator

3

bottonlamp

4

water suction

5

water jet

6

draining switch

7

waterfall

8

drainage

9

air bubble jet

SIZE

:1400

X

1400

X

2200

mm

14

00

14

00

2

2

0

0

5

4

0

125

0

18

00

100

400

200

200

90

0

The socket 

of power and 

the socket 

of telephone

Cold 
water 
pipe

Hot 
water 
pipe

Drain

40

0

200

The socket 
of bottom 
bathtub

INSTALLATION

 

PROCESS

03

04

As the

     

”“

     

from the picture,please make the connection according to the serial number v1,v2,etc.

Drawing

 

of

 

water

 

connection

Отзывы: