merten INSTABUS ARGUS 220 Connect Скачать руководство пользователя страница 6

  Chapter 5: ARGUS

 

5.1 ARGUS movement detector, surface-mounted

 INSTABUS ARGUS 220 Connect

 Art. no. 6315 ..

Version 03/04

6

Mounting the ARGUS on corners and fixed pipes

You can mount the ARGUS on inner/outer corners or 
fixed pipes using the Merten mounting bracket (acces-
sories, art. no. 5652 91/92/93). You can feed the bus 
line to the device from behind through the mounting 
bracket.

Connecting the EIB bus line

1

Strip approx. 14 mm of insulation from the bus li-
nes.

2

Insert the red bus line (+) into the (+) terminal.

3

Insert the black bus line (-) into the (-) terminal.

|

Note
You can wire the bus line through the two termi-
nals (+) and (–) without any problems arising.

Mounting the top section of the ARGUS

1

Place the top section on the wall connection box 
from the front. Ensure that the connecting pins in-
serted in the top section do not become bent.

2

Fix the top section with the two screws supplied.

3

Place the cover plate onto the markings and slide it 
downwards.

Bus

+ -

ARGUS

+

-

3

1

2

Содержание INSTABUS ARGUS 220 Connect

Страница 1: ...the mounting bracket art no 5652 which is available as an accessory The in tegrated functional display lights up when movement is detected and thus simplifies the alignment of the device at the instal...

Страница 2: ...ctuate considerably at vari able temperatures A Inner security zone with an angle of detection of 360 and a radius of approx 4 m B Central security zone with an angle of detection of 220 and an area o...

Страница 3: ...een the luminaire and the movement detector If this distance cannot be achieved you can use the in serts provided to blank out the light source from the area of detection If possible mount the movemen...

Страница 4: ...sen installation site should be such that undesired heat sources can not be detected Undesired sources of heat could in clude the following moving trees shrubbery etc with a temperature that differs f...

Страница 5: ...the ceiling In order to install the ARGUS on the ceiling you must rotate the sensor head Change the direction of rotati on once you have reached the end stops 1 Turn the sensor head upwards until it...

Страница 6: ...ecting the EIB bus line 1 Strip approx 14 mm of insulation from the bus li nes 2 Insert the red bus line into the terminal 3 Insert the black bus line into the terminal Note You can wire the bus line...

Страница 7: ...ion program you can either set the time in the software or on the time controller 1 Set the time to 1 second left hand stop 2 Set the brightness controller to daytime operation sun symbol right hand s...

Страница 8: ...of detection 1 Place the inserts exactly on those areas of the sen sor head which should be masked from detection 2 Ensure that the brightness sensor A is not cove red as the sensitivity to light is...

Страница 9: ...ghtness Brightness dependent switching Integrated staircase lighting timer Lockable via the bus Can be switched via the bus trigger object Setting the safety interval Function LED ARGUS cyclical 1311...

Отзывы: