![Meritor MM-0861 Скачать руководство пользователя страница 80](http://html.mh-extra.com/html/meritor/mm-0861/mm-0861_maintenance-manual_1774382080.webp)
Copyright Meritor, Inc., 2022
MM-0861 / Revised 06-22
Page 78
Printed in USA
7 Assembly
Transfer Case Assembly Test
CAUTION
The air pressure must not exceed 10 psi (0.69 bar). Damage to
components can result.
1. Pressure test the transfer case assembly for air leakage.
2. Verify the fittings are installed correctly.
3. Remove the breather assembly. Figure 7.51.
MTC-4208X AND MTC-4210X
REAR OUTPUT
POSITION
PTO
LOCATION
4004233a
BREATHER
REAR COVER
Figure 7.51
4. With the correct fitting installed into the breather port, apply a
pressure of 8-10 psi (0.55-0.69 bar).
5. Shut the air supply off.
If the pressure decreases by more than 2 psi (0.14 bar)
in 10 minutes:
Check for external leaks at the fittings.
6. Correct the leakage problem and retest.
7. Reinstall the breather assembly.