
4. Measure pane (continued)
1 –
Optional
: Connect the Stroke Counter cable
to the Measure pane
Measure
Stroke Counter
Note:
The PIT5000 has a digital counter that is equipped
to supply power and count the strokes made by high-
pressure, plunger pumps during pressurization of the
pipe section under test and the subsequent pressure
test.
2 - Pressure hose
Measure
3 & 4 - Connect the RTD cables to the Measure
pane
Ambient Temp
Note:
The two RTD cables are identified by M12
connectors at both ends.
Optional:
Pipe Temp
Note:
If you do not require the
pipe temperature
, you
can clear this measurement from the
Setup > Test Info
sub-tab.
Содержание PIT5000
Страница 1: ...The PIT5000 Pipeline Integrity Tester A Pipeline Hydrostatic Testing Device...
Страница 2: ...Introductory information Notification Statements Disclaimer Copyright...
Страница 6: ...Protect the PIT5000 Protect the PIT5000 Do not substitute parts...
Страница 12: ...Hardware Recommended power connections...
Страница 13: ...Temporary power connections...
Страница 14: ...Connecting the 12 V battery Four wires to two battery lugs Black Green negative White Red positive...
Страница 19: ...3 Computer pane Computer pane 4 Measure pane Measure pane 1 2 3 4...
Страница 22: ...6 Industrial Keyboard Keyboard Note No mouse is included 7 Serial number label Serial number label...
Страница 24: ...If the time is incorrect Set the time in Windows 10 End Test Yes Date and time settings Time Language...
Страница 33: ...PC Setup sub tab continued Build Report button...