Mercury Security MS-ICS Скачать руководство пользователя страница 2

 

Mercury Security © 2017 

MS-ICS 

DOC  10107-0053 

REV 1.02 

 Page   2 

2.  Setting Up the MS-ICS Hardware: 
 

DIP Switches: 

The four switches on S1 DIP switch are used to configure the operating mode of the MS-ICS controller.  DIP 
switches are read on power-up except where noted.  Pressing switch S2 causes the MS-ICS to reboot. 

Definitions 

OFF 

OFF 

OFF  OFF  Normal operating mode. 

ON 

After initialization, enable default User Name (admin) and Password 
(password).  The switch is read on the fly, no need to reboot. 
See IT security section for additional information 

OFF 

ON 

OFF  Use factory default communication parameters. 

ON 

ON 

OFF  Use OEM default communication parameters.  Contact system 

manufacture for details.  See Bulk Erase below. 

ON 

Disable TLS secure link.  Switch is read only when logging on. 

ON 

ON 

OFF  OFF  Bulk Erase prompt mode at power up.  See Bulk Erase below. 

All other switch settings are unassigned and reserved for future use.  X = 

don’t care. 

 

In the factory or OEM default modes, downloaded configuration/database is not saved to flash memory. 

Factory Default Communication Parameters:

 

Network: static IP address: 192.168.0.251 
Subnet Mask: 255.255.0.0 
Default Gateway: 192.168.0.1 
DNS Server: 192.168.0.1 
Primary Host port: IP server, no encryption, port 3001, communication address: 0 
Alternate Host Port 1: RS-232, 38,400 baud, no encryption, no flow control. 

3.  Input Power Wiring: 

The MS-ACS requires 12 Vdc for input power and is connected to J2.  Pins 1 and 2 are connected to ground 
and pin 3 is connected to +12 Vdc.   

 

Observe POLARITY on 12 Vdc input! 

J2 mates with the following housing and uses two crimp contacts:  
Housing: Molex 39-01-4030 
Crimp contact: Molex 39-00-0047 (22-28 gauge), 39-00-0039 (18-24 gauge) 

4.  Cabinet Tamper, Low UPS Battery and UPS Fault Input Wiring: 

There  are  three  dedicated  inputs  for  cabinet  tamper,  low  UPS  battery  and  UPS 
fault monitoring.  Normal (safe) condition is a closed contact.  If these inputs are 
not used, suggest installing a jumper wire. 

5.  Communication Wiring:

 

 

The MS-ICS controller communicates to the host via the on-board Ethernet 10-BaseT/100Base-TX port. 

An  alternate Ethernet 10-BaseT/100Base-TX host communication port connection is supported  by  using the 
optional Lantronix Micro125 Ethernet interface daughter board.  This alternate host connection has not been 
evaluated by UL. 

J1 connects to the first MS-ACS board.   

 

The 34-conductor ribbon cable is non-standard.  Do not use a floppy disk drive cable. 

TB2  is  used  to  connect  to  remote  serial  I/O  panels.    This  2-wire  RS-485  interface  allows  multi-drop 
communication on a single bus of up to 4,000 feet (1,219 m).  Use twisted pair (minimum 24 AWG) with a drain 
wire  and  shield  for  communication.    Install  termination  jumpers  only  on  the  units  at  each  end  of  the 
communication line. 

GND

TMP

GND

PFL

GND

BAT

TB1

6

1

CABINET

TAMPER

LOW

BATTERY

POWER

FAULT

Содержание MS-ICS

Страница 1: ...n ribbon cable up to two MS ACS are supported Standard Mercury remote serial I O panels may be connected to the external 2 wire RS 485 multi drop communication bus MS ICS J5 1 4 3 2 S1 ON D7 1 2 3 4 5 6 J8 TR TR GND TB2 4 1 BATTERY BR CR2330 REPLACE ANNUALLY GND TMP GND PFL GND BAT TB1 6 1 BT1 3V CR BR2330 S2 J4 J2 12VDC J1 1 1 75 44 55 6 11 155 19 8 58 218 01 J5 CONNECTION FOR LANTRONIX MICRO125 ...

Страница 2: ...38 400 baud no encryption no flow control 3 Input Power Wiring The MS ACS requires 12 Vdc for input power and is connected to J2 Pins 1 and 2 are connected to ground and pin 3 is connected to 12 Vdc Observe POLARITY on 12 Vdc input J2 mates with the following housing and uses two crimp contacts Housing Molex 39 01 4030 Crimp contact Molex 39 00 0047 22 28 gauge 39 00 0039 18 24 gauge 4 Cabinet Tam...

Страница 3: ...s 1 3 and 5 are turned ON for approximately 1 5 seconds after the hardware initialization has completed then the application code is initialized The amount of time the application takes to initialize depends on the size of the database about 3 seconds without a card database Each 10 000 cards will add about 3 seconds to the application initialization When LED s 1 through 4 flash at the same time d...

Страница 4: ... seconds 7 When complete only LEDs 1 4 will flash for 8 seconds 8 The MS ICS board will reboot 8 seconds after LEDs 1 4 stop flashing no LEDs are on during this time 9 IT Security When installing the MS ICS it is important to ensure that it done in a secure manner Upon installation the user accounts to the web configuration page should be created with secure passwords and that all DIP switches are...

Страница 5: ...tice Warranty Mercury Security warrants the product is free from defects in material and workmanship under normal use and service with proper maintenance for one year from the date of factory shipment Mercury Security assumes no responsibility for products damaged by improper handling or installation This warranty is limited to the repair or replacement of the defective unit There are no expressed...

Отзывы: