background image

General Technical Guide VEGA Lightbars Class 2 Siren / SPA Handy with Roof Connector 

GT-0775-RAM  Ind B 

24/10/2018 

Head Office

: Zone d’Activités « Les Gailletrous » - rue Louis Pasteur- 41260 LA CHAUSSEE SAINT VICTOR 

Tel : 02 54 57 52 52 

– Fax 02 54 56 80 00 

SAS with capital 

102. 400 € - APE (NAF) 2790 Z – SIRET 310 999 891 00040 

 

Page 10 

31946-01 

 

6.8. 

LIGHTBAR INSTALLATION 

 
4 x H M06x16 IN A4 screws 
8 x Ø6x14x1.2 IN A4 flat washers 
4 x H M06 IN A4 locking nuts 
 

  Position the lightbar on the roof by inserting the neoprene wedges between the bindings and the 

roof. 

  Adjust the horizontality of the lightbar by adjusting the levels of the fixing screws of the upper and 

lower legs 

  Locate and mark the piercing points. 

  Drill the roof at the locations defined at Ø 6.5mm. 

  Deburr the holes. 

  Apply corrosion protection at the holes (product not supplied) 

  Apply silicone sealant (not supplied) to the holes to seal the roof passages. 

  Place the lightbar, equipped with its fixings on the neoprene holds, on the roof. 

  Insert the screws and washers. 

  Place the fastening plywood under the roof and screw with the washers and nuts to a torque of 3NM 

(aluminum roof). 

 
 

 

 

 
 

 

 

Tighten the fixing screws on the base of the lightbar to a torque of 3NM 

 

 
 

 

 

Содержание VEGA LIGHTBAR CLASS 2 Series

Страница 1: ...LASS 2 SIREN SPA HANDY WITH ROOF CONNECTOR 1 KIT COMPOSITION 2 2 AVAILABLE VERSIONS 3 3 DIMENSIONS 3 4 WEIGHT DEPENDING ON VERSIONS 3 5 ELECTRICAL CHARACTERISTICS 4 6 INSTALLATION 5 6 1 SYNOPTIC 5 6 2 INSTALLATION OF MOUNTINGS 5 6 3 18 POINT ROOF CONNECTOR 6 6 4 ROOF MOUNTING 6 6 5 BASE DIMENSIONS 6 6 6 ROOF DRILLING DIAGRAM 7 6 7 MOUNTING EVALUATION 7 6 8 LIGHTBAR INSTALLATION 10 7 GENERAL WIRING...

Страница 2: ...face F CCS BLL module for traditional controls via switches G Hand brake module For controls depending on the condition of the hand brake grill lights flashing scrolling WARNING CONCERNING THE MOUNTING OF MERCURA S EQUIPMENT The installer is fully responsible for the mounting of equipment on a vehicle The installer must define the means and the material necessary for mounting of equipment in order...

Страница 3: ...00040 Page 3 31946 01 2 AVAILABLE VERSIONS Length Side Front Rear Alley lights Reference 1200 Blue Blue x x 29243 1600 29245 1200 Blue Blue Blue x 29247 1600 29249 1200 Blue Blue Amber Yes 29251 1600 x 29253 1200 Amber Amber Amber x 29255 1600 x 29257 1200 SPA Blue Blue Amber Yes 29260 1300 SPA Amber Amber Amber 29261 3 DIMENSIONS 4 WEIGHT DEPENDING ON VERSIONS REFERENCES 29239 29241 29243 29245 2...

Страница 4: ...Flash Mode 2 1 A peak for 13 5 volts 1 3 A peak for 27 volts 1 1 A average for 13 5 volts 0 7 A average for 27 volts Left Scrolling Mode 0 6 A peak for 13 5 volts 0 4 A peak for 27 volts 0 35 A average for 13 5 volts 0 25 A average for 27 volts Right Scrolling Mode 0 6 A peak for 13 5 volts 0 4 A peak for 27 volts 0 35 A average for 13 5 volts 0 25 A average for 27 volts Flash set with alley light...

Страница 5: ...54 57 52 52 Fax 02 54 56 80 00 SAS with capital 102 400 APE NAF 2790 Z SIRET 310 999 891 00040 Page 5 31946 01 6 INSTALLATION 6 1 SYNOPTIC 6 2 INSTALLATION OF MOUNTINGS Assembly of upper and lower mountings 8 x CHC M06x12 INOX screws 16 x Ø6x14x1 2 IN A4 flat washers 8 x H M06 IN A4 locking nuts Installation of mountings on base 4 x H M06x20 IN screws 4 x Ø6x14x1 2 IN A4 flat washers 4 x H M06 IN ...

Страница 6: ...USSEE SAINT VICTOR Tel 02 54 57 52 52 Fax 02 54 56 80 00 SAS with capital 102 400 APE NAF 2790 Z SIRET 310 999 891 00040 Page 6 31946 01 6 3 18 POINT ROOF CONNECTOR A Roof connector base B Protective cap of the roof connector C Roof connector gasket 6 4 ROOF MOUNTING A Vehicle s roof B Vehicle s 2 drilling points C Roof connector gasket D 18 point roof connector base 6 5 BASE DIMENSIONS ...

Страница 7: ...ixing points A 2 base fixing screws B 18 point Harting base C Roof connector gasket D Vehicle s roof E Roof drilling refer to the template F 2 inox washers G 2 star washers H 2 locking nuts 6 7 MOUNTING EVALUATION Temporarily place the lightbar on the roof to assess its position and inclination on the vehicle This pre installation operation should also enable to evaluate harness routing inside the...

Страница 8: ... Activités Les Gailletrous rue Louis Pasteur 41260 LA CHAUSSEE SAINT VICTOR Tel 02 54 57 52 52 Fax 02 54 56 80 00 SAS with capital 102 400 APE NAF 2790 Z SIRET 310 999 891 00040 Page 8 31946 01 A Vehicle s roof B VEGA lightbar with siren C Adjustable mounting pad D Rubber pad GENERAL WARNINGS THE SPEAKER OUTPUT IS ORIENTED FORWARD ...

Страница 9: ...RAM Ind B 24 10 2018 Head Office Zone d Activités Les Gailletrous rue Louis Pasteur 41260 LA CHAUSSEE SAINT VICTOR Tel 02 54 57 52 52 Fax 02 54 56 80 00 SAS with capital 102 400 APE NAF 2790 Z SIRET 310 999 891 00040 Page 9 31946 01 LIGHTBAR MOUNTING RUBBER PAD Lightbar height VEHICLE S ROOF ...

Страница 10: ...prene wedges between the bindings and the roof Adjust the horizontality of the lightbar by adjusting the levels of the fixing screws of the upper and lower legs Locate and mark the piercing points Drill the roof at the locations defined at Ø 6 5mm Deburr the holes Apply corrosion protection at the holes product not supplied Apply silicone sealant not supplied to the holes to seal the roof passages...

Страница 11: ...02 400 APE NAF 2790 Z SIRET 310 999 891 00040 Page 11 31946 01 7 GENERAL WIRING DIAGRAM DEPENDING ON MODEL 7 1 WIRING SYNOPTIC A VEGA lightbar with siren B 18 point roof connectors C Various variables vehicle s control inputs depending on options D Vehicle s charging circuit E 8 way connector F BUS wired interface G Control modules depending on options Dashboard Interface of SPA Handy Control Box ...

Страница 12: ...on the wire side F Information input HANDBRAKE tightened from the MERCURA handbrake module information to the ground G KLAXON impulse input Battery information H Information input CREW MANAGER PEDAL Information to the mass I Information input ROTATING ENGINE or AFTER IGNITION Information to Battery J Fuse Different value depending on the lightbar reference to be calculated according to its compone...

Страница 13: ...rake status from the ignition switch of the vehicle without disturbing the original circuit of the vehicle It must imperatively be inserted between the contactor of the vehicle and the information line connecting it to the dashboard indicator circuit A Vehicle s HANDBRAKE contactor B MERCURA s HANDBRAKE module C HAND BRAKE status information output to MERCURA system to be wired on wire n 9 of the ...

Отзывы: