1 of 7
Document Number: MER_IS_0009 8197479 06/2018
Follow these instructions to install the MercoMax (MHC) Visual Holding Cabinets.
1.
Unpack equipment and accessories at the FAS location to ensure the equipment arrived
in good condition and all pieces are included. The FAS should plug in units to ensure
they operate correctly. Coordinate with the store to ensure the staff will be present for
training on the night of install and the “morning” person is present so they can train the
next morning.
2.
Ensure the proper outlets / breakers for the cabinets are installed in the store where
the cabinets are going to be located.
Receptacles will be #’s 5-15R, 5-20R, & L5-30R to
match the plugs listed below.
This may have to be done with a site visit.
Domestic Model Voltage, Cycle, Phase Watts
Amps
Plug
MHC22SNT1T 120V,
60H,
1Ph 660
5.5
5-15P
MHC24SNT2T 120V,
60H,
1Ph
1320
11.0
5-15P
MHC52SNT1T 120V,
60H,
1Ph
1920
16.0
5-20P
MHC54SNT1T 120V,
60H,
1Ph
2880
24.0
L5-30P
3.
Read the Installation and Operation manual to understand proper installation, set up,
operation, cleaning, and preventive maintenance.
4.
Wash all tray seal, trays, RFID collars, and trivets / false bottoms. This is done at the
store with the staffs help. See photos below and on the following page.
Subject: FAS Installation Instructions (Scope
of Work for RISE)
Models affected: MercoMax (MHC) Visual
Holding Cabinets
Instruction
Sheet
MERCO
8700 LINE AVENUE, SHREVEPORT, LA 71106
800-379-7278
WWW.MERCOPRODUCTS.COM
L5
‐
30P