2
4
3
5
P 3
Please retain product label and instructions for future reference
Step 1
Place the Floor
(No. 5)
onto a flat,
level base, ensuring the base has
suitable drainage, free from areas
where standing water can collect.
Step 2
Place the Plain Gable
(No. 2)
and Plain
Panel
(No. 4)
onto the Floor. Secure the
Panels together with 3x50mm screws as
shown.
**Do not fix to the Floor until the Roof is
fiitted.
3x50mm screws.
Pre drill
hole
50mm
screw
Step 3
Fix the Window panel
(No. 3)
into position
with 3x50mm screws.
**Do not fix to the Floor until the Roof is
fiitted.
3x50mm screws.
Pre drill
hole
50mm
screw
Pre Assembly
Remove the transportation blocks from
the bottom and top of each panel
before beginning assembly