Please retain product label and instructions for future reference
Step 5
Parts needed - &
Place the Ridge Bar
(No. 11)
in between
the Door Gable
(No. 1)
and Plain Gable
(No. 4)
. Ensure the top corners of the
Ridge Bar
(No. 11)
are flush with each
top point (see illustration).
Secure in place using a L bracket
(No.18)
on each end and 4x30mm
screws per brace.
8x30mm screws
30mm
screw
18
18
18
11
1!
2!
Pre drill
hole
11
Step 6
Parts needed - &
Fix an Eaves Frame
(No. 14)
to each
roof OSB sheet using 3x30mm screws
per eave.
Fix the Roof sheets
(No. 5)
to the roof
ensuring they come together at the
top using 12x40mm screws per sheet,
directly through the roof sheet at the
top. Make sure to attach the roofs to
the ridge bar.
6x30mm screws
24x40mm screws
40mm
screw
30mm
screw
5
5
14
1!
2!
Pre drill
hole
14
5
Step 7
Parts needed -
Fit the Fascia Block
(No. 15)
to the front of
the building using 4x30mm screws, make
sure it is flush with the outside edge of
each roof OSB sheet
(No. 5)
.
4x30mm screws
30mm
screw
1!
2!
Pre drill
hole
15
15
1!
2!
Pre drill
hole
Step 8
Once the roof
(No.5
) is fixed, secure the
building to the Floor
(No.6)
using
5x50mm screws per panel, making sure
to screw into the Floor bearers.
20x50mm screws
50mm
screw
b
b
b
b
b
b
b
b
b
b
b
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
www.merciagardenproducts.co.uk P6
Содержание SI-002-001-0022
Страница 11: ... 2 1 3 4 ...
Страница 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2 ...