Mercia Garden Products Helios 03HEL1010DDFW-V3 Скачать руководство пользователя страница 1

P 1

03HEL1010DDFW-V3

10x10 Helios Summer House

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

Содержание Helios 03HEL1010DDFW-V3

Страница 1: ...can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry sp...

Страница 2: ...R1516X2356 V1 Front Floor AI 03HELTAGFLOOR2907X717 V1 Back Floor QTY 2 AI 03HELTAGFLOOR1459X2387 V1 Master Door AI 03HEL1010MD Slave Door AI 03HEL1010SD Roof Bar QTY 4 AI 03HELRB2828X101 V1 Roof Block...

Страница 3: ...hinges No 34 to both the master No 12 slave No 13 doors using 3x30mm screws per hinge Fix to the doors via the outer plate Fix the doors into the door panel No 1 aperture securing into place using 3x3...

Страница 4: ...l product and is subject to movement with changing weather conditions It is important that you fit the turn buttons and tower bolts as per the fitting instructions 50mm screw Pre drill hole 60mm screw...

Страница 5: ...mm screw Step 6 Place the first ridge bar No 14 inside the building and line up with the upright framing on each gable Align the back edge of the ridge bar with the top of the gable Once in place mark...

Страница 6: ...hole 7 20 Step 9 Place the front roof No 7 onto the assembly securing into place using 4x40mm screws as shown in the illustration Following the same method outlined in step 8 fix the front roof inter...

Страница 7: ...e last sheet which requires 250mm overlap 165x Felt Tacks HANDLE WITH CARE 1 2 3 4 Step 13 To secure the roof felt in place sandwich the felt between the top No 21 and bottom No 22 roof trims as shown...

Страница 8: ...ent in the air 2x30mm Black Screws 35 Please retain product label and instructions for future reference 50mm screw Pre drill hole 50mm screw Pre drill hole S IL IC O N E S E A L A N T Step 17 Attach t...

Страница 9: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instruct...

Отзывы: