![Mercia Garden Products Groundsman Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/mercia-garden-products/groundsman/groundsman_general-instructions-manual_1772597003.webp)
Step 2
Place the floor panels
onto a firm & level base,
ensure the base has
suitable drainage free
from areas where
standing water can
collect.
Secure the floors
together using 10x50mm
screws fixing in an
alternating pattern.
10x50mm Screws
Pre drill
hole
50mm
screw
Step 3
Place the plain
gable and the
window panels
onto the floor
and secure using
6x50mm screws.
b
DO NOT
secure
the building to
the floor until the
roof is fixed in
place.
6x50mm Screws
Pre drill
hole
50mm
screw
5
5
2
3
* Window panels can
be placed on either
side of the building.
Using the same method outlined
in Step 3, fix the plain sides & the
door gable using 12x50mm
screws.
DO NOT
secure the building to
the floor until the roof is
fixed in place.
b
b
Step 4
12x50mm Screws
Pre drill
hole
50mm
screw
Step 5
Fix the roof panels to the
building. Ensure the framing
fits into the slot at the top
of the gables.
Secure in place using 12x30mm
screws per roof panel.
24x30mm Screws
Pre drill
hole
30mm
screw
8
8
b
b
b
b
b
b
3
4
4
1
b
b
b
b
P 3
Please retain product label and instructions for future reference