Step 2

Place the floor panels
onto a firm & level base,
ensure the base has
suitable drainage free
from areas where 
standing water can 
collect.

Secure the floors 
together using 10x50mm
screws fixing in an
alternating pattern.

10x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

Place the plain 
gable and the 
window panels 
onto the floor 
and secure using 
6x50mm screws.

b

DO NOT

 secure 

the building to 
the floor until the 
roof is fixed in 
place.

6x50mm Screws

Pre drill 

hole

50mm 

screw

5

5

2

3

* Window panels can
be placed on either
side of the building.

Using the same method outlined
in Step 3, fix the plain sides & the
door gable using 12x50mm
screws.

DO NOT

 secure the building to

the floor until the roof is
fixed in place.

b

b

Step 4

12x50mm Screws

Pre drill 

hole

50mm 

screw

Step 5

Fix the roof panels to the
building. Ensure the framing 
fits into the slot at the top 
of the gables.

Secure in place using 12x30mm 
screws per roof panel.

24x30mm Screws

Pre drill 

hole

30mm 

screw

8

8

b

b

b

b

b

b

3

4

4

1

b

b

b

b

P 3

Please retain product label and instructions for future reference

             

Отзывы: