
Step 6
Once the roof is fixed,
secure the building to the
floor with 24x50mm screws.
* Ensure to screw in alignment
with the floor bearers.
24x50mm Screws
Pre drill
hole
50mm
screw
Felt
tacks
Pre drill
hole
40mm
screw
Pre drill
hole
30mm
screw
P 4
Please retain product label and instructions for future reference
Step 7
Cut the felt into 3 sheets and
lay onto the roof as shown in
the diagram ensuring there is
50mm overhang around the
sides. Place the middle one so
that it overlaps the outer sheets.
Fix using 180x felt tacks at
100mm intervals.
180x Felt Tacks
14
Step 8
Attach the cover trims
(No. 14)
to the
building using 3x40mm
screws per strip.
18x40mm Screws
* Felt measurement: 3250mm
HANDLE
WITH CARE
2
3
4
Step 9
Fix the fascia blocks
(No. 17)
to
roof using 2x30mm screws per
block. Ensure the blocks are flush
to the edge of the roof.
Attach the fascias
(No. 12)
and
finials
(No. 18)
to the front and
back of the building with
12x30mm screws.
20x30mm Screws
14
14
14
12
12
17
18
Содержание GROUNDSMAN 10 X 8
Страница 1: ...P 1 x2 10 X 8 Groundsman ASSEMBLY INSTRUCTIONS 01PTGRO1008DD V3...
Страница 7: ...P 7...
Страница 8: ...P 8 1 2...
Страница 9: ...P9...