Mercia Garden Products Clover 03CLOV0808-V1 Скачать руководство пользователя страница 6

P 6

Please retain product label and instructions for future reference

             

Step 9

Once all four roof sides are on the 

building, pull the corners together 

and secure underneath the roof as 

shown. Fix using 3x40mm screws 

per join.

The Roof bearers may need to be 

unscrewed and repositioned. 

*Roof panels will support   each 

other if bearers are unscrewed.

Once the panels are secure, 

re-screw the bearers if neccessary, 

and secure the two bearers 

together with 1x70mm screw.

12x50mm Screws

1x70mm Screws

Step 10

Parts needed - No. 17 QTY 4

Fix each Eaves frame 

(No. 17) 

to 

the Roof with 3x 30mm screws.

Align each Eaves frame with the 

centre of each side.

24x30mm Screws

Pre drill 

hole

50mm 

screw

70mm 

screw

Pre drill 

hole

30mm 

screw

Step 11

Secure the Roof onto the building  

with 60mm screws evenly spaced. 

24x60mm Screws

Pre drill 

hole

60mm 

screw

Step 12

Fix the building to the floor  by 

screwing down through the 

framing of the panels into the 

floor. Use 20x50mm screws.

20x50mm Screws

Pre drill 

hole

50mm 

screw

17

17

Содержание Clover 03CLOV0808-V1

Страница 1: ...an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and...

Страница 2: ...Door AI 03HGD569X1720 V1 Roof OSB PI 03 0349 QTY 8 1 2 3 4 5 6 7 9 12 21 T Hinge QTY 6 PI 07 0185 23 Door Handle QTY 2 PI 07 0081 25 22 Turn Button QTY 2 PI 07 0034 24 Press Lock PI 07 0162 Tower Bol...

Страница 3: ...m screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 8x50mm Screws Pre drill hole 50mm screw Step 2 Parts needed No 2 QTY 1 No 3 QTY 1...

Страница 4: ...g flush to the top and side as shown Please retain product label and instructions for future reference A Step 5 continued Parts needed No 9 QTY 7 No 10 QTY 4 No 11 QTY 7 No 12 QTY 8 Take a second piec...

Страница 5: ...e drill hole 60mm screw Step 6 Parts needed No 14 QTY 1 No 20 QTY 1 Fix the Roof Block No 20 to Roof Bearer B No 14 using 2x60mm screws Screw up through the bearer into the block 2x70mm Screws A B A C...

Страница 6: ...essary and secure the two bearers together with 1x70mm screw 12x50mm Screws 1x70mm Screws Step 10 Parts needed No 17 QTY 4 Fix each Eaves frame No 17 to the Roof with 3x 30mm screws Align each Eaves f...

Страница 7: ...e the previous felt and fix with evenly spaced felt tacks Make sure the felt overlaps by 50mm C Use the off cuts of the previous steps to create 4 small strips for the top of the building D Use the tr...

Страница 8: ...Fix the Master Door No 6 to the building Secure the T Hinges No 21 to the Door with 3x30mm screws per hinge Fix the T hinges to the building with 4x30mm screws per hinge 18x30mm Chrome Screws Pre dril...

Страница 9: ...e 30mm screw Pre drill hole 30mm screw 18 18 19 18 18 Step 21 Parts needed No 8 QTY 1 No 26 QTY 3 Fix 2 Unequal Hinges No 26 to the Window No 8 using 2x30mm screws per hinge Fix the Window into the op...

Страница 10: ...k No 24 to the back of the Master door with 4x30mm screws Making sure to align the key holes Fix the Door handles No 23 to each door on the outside of the building with 2x20mm per handle 12x20mm Screw...

Отзывы: