P 1

03CLOV0808-V1

8x8 Clover Summerhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufacturers recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions. The base should be slightly smaller than the external 

measurement of the building i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Содержание Clover 03CLOV0808-V1

Страница 1: ...an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and...

Страница 2: ...Door AI 03HGD569X1720 V1 Roof OSB PI 03 0349 QTY 8 1 2 3 4 5 6 7 9 12 21 T Hinge QTY 6 PI 07 0185 23 Door Handle QTY 2 PI 07 0081 25 22 Turn Button QTY 2 PI 07 0034 24 Press Lock PI 07 0162 Tower Bol...

Страница 3: ...m screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 8x50mm Screws Pre drill hole 50mm screw Step 2 Parts needed No 2 QTY 1 No 3 QTY 1...

Страница 4: ...g flush to the top and side as shown Please retain product label and instructions for future reference A Step 5 continued Parts needed No 9 QTY 7 No 10 QTY 4 No 11 QTY 7 No 12 QTY 8 Take a second piec...

Страница 5: ...e drill hole 60mm screw Step 6 Parts needed No 14 QTY 1 No 20 QTY 1 Fix the Roof Block No 20 to Roof Bearer B No 14 using 2x60mm screws Screw up through the bearer into the block 2x70mm Screws A B A C...

Страница 6: ...essary and secure the two bearers together with 1x70mm screw 12x50mm Screws 1x70mm Screws Step 10 Parts needed No 17 QTY 4 Fix each Eaves frame No 17 to the Roof with 3x 30mm screws Align each Eaves f...

Страница 7: ...e the previous felt and fix with evenly spaced felt tacks Make sure the felt overlaps by 50mm C Use the off cuts of the previous steps to create 4 small strips for the top of the building D Use the tr...

Страница 8: ...Fix the Master Door No 6 to the building Secure the T Hinges No 21 to the Door with 3x30mm screws per hinge Fix the T hinges to the building with 4x30mm screws per hinge 18x30mm Chrome Screws Pre dril...

Страница 9: ...e 30mm screw Pre drill hole 30mm screw 18 18 19 18 18 Step 21 Parts needed No 8 QTY 1 No 26 QTY 3 Fix 2 Unequal Hinges No 26 to the Window No 8 using 2x30mm screws per hinge Fix the Window into the op...

Страница 10: ...k No 24 to the back of the Master door with 4x30mm screws Making sure to align the key holes Fix the Door handles No 23 to each door on the outside of the building with 2x20mm per handle 12x20mm Screw...

Отзывы: