Mercia Garden Products Cherry Playhouse Скачать руководство пользователя страница 6

12

P 6

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

5

Step 7

Parts needed -            x2 &          x2         

 

 

Fix an Eaves Frame x2 

(No. 9)

 to each Roof Sheet x2 

(No. 5)

 using 5x30mm screws per 

eave.

10x30mm screws. 

 

Position the roof sheets 

on the building.

Ensure the roof sheet sits flush 

with the building at the back. Fix 

using 10x40mm 

screws per sheet. 

20x40mm screws. 

30mm 

screw

40mm 

screw

9

a

b

a

b

9

5

Step 8

 

Position the building square between the 

floor and cladding.

Fix the building to the floor using 50mm 

screws as shown in the illustration. Use 

3x50mm screws per panel, making sure to 

screw into the floor.

 

12x50mm screws. 

50mm 

screw

Step 9

Parts needed - 

Fit the Fascia Block 

(No. 12)

 to the 

front of the building using 

4x30mm screws, ensuring it is 

flush with the outside edge of 

each roof sheet.

  

4x30mm screws. 

12

30mm 

screw

Step 10

 

Cut the Felt into 2 sheets of 

1353mm length and lay 

onto the roof as shown in 

the diagram ensuring there 

is a 50mm overhang around 

the sides. 

60x Felt tacks 

Felt 

tacks 

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

Содержание Cherry Playhouse

Страница 1: ...rd surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly...

Страница 2: ...8 9 10 11 12 Ridge Bar 28x28x1048mm Eaves Frame 28x28x1205mm Floor Joist 28x28x1110mm Fascia 95x12x800mm Fascia Block 44x44x200mm QTY x2 QTY x4 QTY x4 FS2828 1048mm FS2828 1205mm FS2828 1110mm FAS800...

Страница 3: ...Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer D...

Страница 4: ...oor opening It is important that the door is placed central in the space provided with a 12mm gap around the edge Use a 12mm strip to help keep the gap correct Fix the Hinges x2 No 19 to the door fram...

Страница 5: ...2 3 Step 5 Parts needed Attach the Door Gable No 1 to the remianing Window Side No 3 with 6x50mm screws Position the panels so there are equal gaps between the floor and cladding Fix the corners with...

Страница 6: ...p 8 Position the building square between the floor and cladding Fix the building to the floor using 50mm screws as shown in the illustration Use 3x50mm screws per panel making sure to screw into the f...

Страница 7: ...Parts needed Place a Window Cross No 16 against the inside of each window Position the frame centrally to the window and fix using 4x20mm screws per frame 12x20mm screws Place the Wooden Door Handle...

Страница 8: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Отзывы: