background image

P 10

2

4

IMPORTANT : 

Pre-drill before fixing screws.

Step 11

Parts Needed - No. 2 QTY 2

 

 

   No. 3 QTY 2

 

 

   No. 4 QTY 2

 

 

   No. 5 QTY 2

Arrange the left, right, top & bottom window 

frames (

No’s. 2, 3, 4,& 5

) onto a firm and level 

surface. Secure the top and bottom frames to 

the uprights using 2x80mm screw per corner, 

ensuring the screws do 

NOT

 protrude through 

the front of the window framing.

Use this method to construct 2 window frames. 

16x80mm Screws

Pre drill 

hole

80mm 

screw

5

3

5

3

The internal lip of the window 

frame should be postioned on 

the inside of the building.

.

Pre drill 

hole

30mm 

screw

1

7

7

7

IMPORTANT: 

Pre-drill before fixing screws.

Step 12

Parts Needed - No. 1 QTY 2

                                 No. 7 QTY 4

Position the window 

(No. 1)

 so that it 

sits centrally within the window 

frame. Fix the female part of the flag 

hinge 

(No. 7)

 to the window using 

4x30mm screws, attach the male part 

of the flag hinge 

(No. 7)

 to the 

window frame using 4x30mm screws 

ensuring that the window can open 

and close freely.

*Ensure to attach the hinge to the 

horizontal frame of the window*

Repeat this method for both windows 

**It is important to fit the windows 

within the frame at this stage so 

that you can establish the position 

of the hinges. The hinges come in 

two parts. Remove the window 

from the frame after fitting.

32x30mm Screws

Please retain product label and instructions for future reference

             

Содержание 0628CSNE0404HGDD2SW-V1

Страница 1: ...where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm groun...

Страница 2: ...AI 0628LOGDDTF V3 Door Frame Bottom 71x70x1508mm QTY 1 AI 0628LOGDDBF V3 Door Strip 16x60x1880mm QTY 1 S1660 1880mm 2 1 3 4 Window QTY 2 AI 06LOGDGW684X1244 V3 5 Window Frame Left Upright 71x70x1412m...

Страница 3: ...QTY 1 LB28 AH64 4000 64mm high board Starter Board 28x66x4000mm QTY 1 LB28RT66 A 4000 66mm high board Log Board 28x120x4000mm QTY 40 LB28 A 4000 Finisher Board 28x80x1287mm QTY 1 LB28RG80 CGL 1299 1x4...

Страница 4: ...oard Pack A QTY 2 AI 06LOGC4X4RBP1 V5 Roof Board Pack C QTY 1 AI 06LOGC4X4RBP3 V5 74 73 72 71 Floor Board Pack AI 0628CSNE0404HGDD2SW FBP V1 Fascia 16x120x2168mm QTY 2 S16120 G 2168 2x14 deg cuts leng...

Страница 5: ...x 182 120mm Screw x 13 80mm Screw x 24 90mm Screw x 12 70mm Bolt Set x 20 There may be extra screws present in the nail bag 70mm Screw x 97 Pre assembly Please note Each board interlocks at either en...

Страница 6: ...qual measurement If the bearers are not alligned equally unscrew and adjust and re align accordingly 10x70mm Screws IMPORTANT Pre drill before fixing screws Example picture 2 screws per bearer per end...

Страница 7: ...crew 38 31 22 39 30 1st 2nd 3rd 5th 4th 22 22 30 Rubber Mallet may be required to fit parts Step 4 Parts needed No 25 QTY 1 Make the assembly level by adding another board No 25 as shown in the diagra...

Страница 8: ...No 17 QTY 6 The Adjustable Door Hinge No 17 comes in three parts Fasten No 17a into 17b as shown in the illustration Place the master and slave doors No s 9 10 onto a flat surface and fix the Adjusta...

Страница 9: ...ing the frame on top of the starter board if you have not yet assembled the door frame refer to step 6 Please note This image is for illustrative purposes and may differ from your choice in product re...

Страница 10: ...screw 1 7 7 7 IMPORTANT Pre drill before fixing screws Step 12 Parts Needed No 1 QTY 2 No 7 QTY 4 Position the window No 1 so that it sits centrally within the window frame Fix the female part of the...

Страница 11: ...ndow and door frames Please note when you get to the top of the boards the rear right hand boards will be slightly lower Ensure that the boards are level and flush with each other as you lay each one...

Страница 12: ...ll before fixing screws 36 Pre drill hole 70mm screw Rubber Mallet may be required to fit parts Step 19 Parts needed No 75 QTY 1 Please Note You can place your gable on either side of the log cabin de...

Страница 13: ...o 45 on to either side of the Roof Purlin No 52 ensuring they sit flush to the end creating a T shape as shown in the illustration Fix in place by screwing into the purlin at an angle as shown in the...

Страница 14: ...ng 1x90mm screw per truss 2x90mm Screws IMPORTANT Pre drill before fixing screws 49 46 49 46 Roof Assembly 2 Roof Assembly 1 Rubber Mallet may be required to fit parts 49 46 49 46 Step 23 Parts needed...

Страница 15: ...y 2 Roof Assembly 1 Rubber Mallet may be required to fit parts 51 50 51 50 Step 25 Parts needed No 40 QTY 6 No 41 QTY 1 No 42 QTY 1 No 43 QTY 1 No 44 QTY 1 Place the finisher boards No 40 41 42 43 44...

Страница 16: ...fore fixing screws 45 Rubber Mallet may be required to fit parts Step 27 You can now fix the assembled roof truss s and roof purlin to the log cabin making sure the attached blocks sit inside the asse...

Страница 17: ...73 72 IMPORTANT Pre drill before fixing screws Step 29 Parts needed No 72 No 73 No 74 HINT keep the roof board packs seperate so they do not get mixed up Start arranging the roof board packs A B C on...

Страница 18: ...74 72 A B C B A 74 A C B A B 72 Roof Assembly 1 Roof Assembly 2 72 73 73 IMPORTANT Pre drill before fixing screws Pre drill hole 40mm screw Step 31 Parts needed No 72 No 73 No 74 HINT keep the roof bo...

Страница 19: ...re fixing screws Pre drill hole 40mm screw Step 33 Parts needed No 72 No 73 No 74 HINT keep the roof board packs seperate so they do not get mixed up Arrange the remaining roof boards A B C onto the r...

Страница 20: ...m screw Step 35 Parts Needed No 8 QTY 2 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm screws Ensure the casement stay is centralised on...

Страница 21: ...fixing the frames is the same Once components have been fitted try closing doors to ensure the doors can be closed and the lock works If your doors do need adjusting please look at step 34 if not proc...

Страница 22: ...nsions 1 2098mm L x 1000mm W 2 3004mm L x 1000mm W 3 2150mm L x 1000mm W 4 4152mm L x 1000mm W 5 2098mm L x 1000mm W 6 1310mm L x 1000mm W 7 1280mm L x 1000mm W 8 3280mm L x 1000mm W 9 2098mm L x 660m...

Страница 23: ...e drill hole This is for illustrative purposes only and may differ from your floor 71 IMPORTANT Pre drill before fixing screws Roof Closure Trim Internal 68 Measure and cut the closure trims to fit th...

Страница 24: ...as previously stated 42x40mm Screws Pre drill hole 40mm screw 64 65 65 66 66 63 66 Pre drill hole 70mm bolt 67 67 Step 45 Parts needed No 67 QTY 10 Arrange the storm braces No 67 around the building...

Страница 25: ...frame fixing in place onto the framing above each window using 3x70mm screws per guard Attach the Rain Guard No 16 to the door frame fixing in place onto the framing above the Door using 3x70mm screw...

Отзывы: