background image

P 3

Please retain product label and instructions for future reference

             

Pre-assembly

*Please note: 

Each board interlocks at

either end in a staggered pattern.

Before securing ensure that the boards

are fitted properly in their respective

tongues and grooves.

Felt Tacks x200

70mm Screw x65

Nail Bag

40mm Screw x470

30mm Screw x96

60mm Bolt Set x16

Содержание 0619LOG018-V4

Страница 1: ...or building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are goi...

Страница 2: ...45x19x3500mm QTY 2 LB19RG45 A 3500 Log Board 120x19x2996mm QTY 20 LB19 A 2996 Log Board 120x19x1123mm QTY 36 LB19 B 1123 Roof Purlin 90x40x3504mm QTY 3 F4090 A 3504 Eaves Frame 27x44x3500mm QTY 2 F27...

Страница 3: ...re assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Felt Tacks x200 70...

Страница 4: ...the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the fram...

Страница 5: ...ter up the door section slide the assembled door frame No 1 and windows No 2 over the boards resting the frame on top of the starter boards Please see instructions provided with your doors and windows...

Страница 6: ...evel and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw Step 6 Parts Needed No 3a QTY 1 No 3b QTY 1 No 7 QTY 1 No 21 QTY 1 Place the last two log boards No s 7 21 on...

Страница 7: ...the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensure the roof boards meet at the top of the apex and leave an over hang at the bottom Due t...

Страница 8: ...e log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the...

Страница 9: ...eded No 20 QTY 8 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illustration ensuring the angled face follows the roof line Once in posit...

Страница 10: ...40mm Screws Pre drill hole 40mm screw 13 14 13 14 13 13 14 IMPORTANT Pre drill before fixing screws Pre drill hole 60mm bolt Step 16 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the...

Отзывы: