It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

P 11

Please retain product label and instructions for future reference

             

Pre drill 

hole

60mm 

bolt

Step 18

Parts needed - No. 25 QTY 8

Arrange the storm braces (No. 25)

around the building (internally ). 

Place 2x storm braces per side 

fixing into place using 2x 60mm 

bolts per brace making sure the 

washer & nut are tightened from 

the outside of the building.

*Ensure the storm braces are

secured at the highest point

possible on each side.

**Storm braces will help your

building expand and contract

properly.

***Important: Ensure each

bolt is tightened using a 

washer so as not to damage 

the log boards.

16x60mm Bolt Sets

25

25

Содержание 0619LOG017-V4

Страница 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be const...

Страница 2: ...B19 B 245 Log Board 120x19x505mm QTY 18 LB19 BEK 505 Log Board 120x19x3500mm QTY 20 LB19 AF 3500 Log Board 54x19x3500mm LB19RG54 AF 3500 Log Board 97x19x3500mm LB19RG97 AF 3500 Log Board 120x19x2396mm...

Страница 3: ...ng ensure that the boards are fitted properly in their respective tongues and grooves Felt Tacks x200 70mm Screw x45 Nail Bag 40mm Screw x390 30mm Screw x96 60mm Bolt Set x16 26 Felt Roof Spacers QTY...

Страница 4: ...No 19 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side of the bearer ensuring the framing re...

Страница 5: ...15 onto the assembly to create your second level Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame by 12 1...

Страница 6: ...1 No 10 QTY 1 No 13 QTY 2 No 14 QTY 1 Following the same method outlined in Pre Assembly lay three boards at the sides and centre No s 13 14 once laid in position place the next two boards onto the fr...

Страница 7: ...rew per side Ensure to stagger the screws so as not to collide with the previous screw 6x70mm Screws 16 9 11 4 4 4 16 12 b Pre drill hole 70mm screw Step 10 Parts needed No 16 QTY 1 Align the Roof Pur...

Страница 8: ...g sure that each board is interlocked flush at the bottom meet at the top of the apex The last board will overhang Using a straight edge and a pencil mark out a line as a guide Cut along the pencil ma...

Страница 9: ...chof the floor boards into the floor bearers 256x40mm Screws 40mm screw Pre drill hole Cut to fit 23 23 Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 23 Closu...

Страница 10: ...felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 3624mm 180x Felt Tacks 1 2 3 4 Step 17 Parts Needed No 20 QTY 2 No 21 QTY 2 Attach the fascia s No s 20 21 around the bui...

Страница 11: ...No 25 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure th...

Отзывы: