background image

P 1

0619LOG016-V4 (

2.5x3m

)

0619LOG016-V4

: 2.5x3m 19mm reverse apex cabin with single (

glass

) glazing

2mm Drill bit

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

BUILDING A BASE

When thinking about where the building and base are going to be constructed: 

Ensure that there will be access (60cm) to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimension.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your specific product code

For ease of assembly use a 

rubber mallet to fit the log 

boards. Do 

NOT

 use a heavy 

hammer.

Ensure to measure and check before cutting 

boards.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

It is advisable to use a hand 

saw when cutting roof and 

floor boards.

To ensure log boards are even, use a spirit 

level to check each layer has been installed 

correctly.

Содержание 0619LOG016-V4

Страница 1: ...outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer ...

Страница 2: ...x110x2996mm QTY 1 LB19RG110 A 2996 Log Board 19x120x2500mm QTY 20 LB19 A 2500 Log Board 19x120x875mm QTY 36 LB19 B 875 Roof Purlin 40x90x3000mm QTY 3 F4090 3000 Eaves Frame 27x44x3000mm QTY 2 F2744 3000 Fascia 16x120x1347mm QTY 4 S16120 1347 Fascia 16x120x3028mm QTY 2 S16120 3028 Bearer 44x44x2308mm QTY 2 F4444 2308 PT Bearer 44x44x2716mm QTY 8 F4444 2716 PT Roof Board 16x121x1344mm QTY 54 MB16 C ...

Страница 3: ... P 3 Please retain product label and instructions for future reference 60mm Bolt Set x16 Pre assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves ...

Страница 4: ...PORTANT Pre drill before fixing screws IMPORTANT Pre drill before fixing screws Pre drill hole 70mm screw a Step 1 Parts Needed No 15 QTY 2 No 16 QTY 8 Lay the bearers No s 15 16 onto a firm and level surface free from areas where standing water can collect as shown in the illustration Fix the framing together at each corner using 8x70mm screws ensuring the frame is flush 8x70mm Screws Pre drill h...

Страница 5: ...future reference 6 7 5 Step 3 Parts Needed No 5 QTY 12 No 6 QTY 12 No 7 QTY 6 No 9 QTY 6 No 10 QTY 12 Following the same method outlined in Pre Assembly lay the first 6 boards No s 5 6 7 9 10 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one 5 9 10 10 6 7 5 Step 5 Parts Needed No 5 QTY 10 No 6 QTY 10 No 7 QTY 5 No 9 QT...

Страница 6: ... 16 No 7 QTY 7 No 9 QTY 6 No 10 QTY 16 Following the same method outlined in Pre Assembly lay the remaining boards No s 5 6 7 9 10 onto the assembly to bring the board level to the top of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 7 Step 7 Parts Needed No 8 QTY 1 No 21 QTY...

Страница 7: ...ds are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You may be required to use the provided spac ers and place a space of 2mm to ensure every roof board lines up with the truss Ensure the roof boards meet at the top of the apex and leave an over hang at the bottom Continue adding the roof boards al...

Страница 8: ... the log board on one side Continue adding the floor boards internally making sure to interlock each individual board DoNOTsecure the boards until the last board has been measured and cut Following the same method outlined previously measure the gap between the bottom of the tongue on the last board placed and the log board Using a straight edge mark out the measurement onto the last floor board N...

Страница 9: ...ep 14 Parts needed No 20 QTY 5 Once the floor has been laid arrange the closure trim No 20 around the outside edge of floor internally measure and cut down accordingly to best match the internal space Secure each trim section into place using 6x30mm spaced equally along the board as shown in the illustration Do NOT fix the closure trim to the floor boards 30x30mm Screws Roof Roof Please retain pro...

Страница 10: ...at the top of the apex 18x40mm Screws Pre drill hole 40mm screw Pre drill hole 60mm bolt Step 18 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side fixing into place using 2x 60mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured at the highest point possib...

Отзывы: