background image

P 4

Please retain product label and instructions for future reference

             

Step 4

Parts needed - No. 2 QTY 1

                                 No. 3 QTY 1

Place the plain gable 

(No. 3)

 and 

one plain side 

(No. 2)

 onto the 

floor and secure together using 

3x50mm screws.

Do not secure the building to 

the floor until the roof is fitted.

3x50mm Screws

50mm 

screw

Pre drill 

hole

3

2

1

Step 5

Parts needed - No. 1 QTY 1

                                 No. 2 QTY 1

Fix the door gable 

(No. 1)

and 

the second plain side 

(No. 2) 

using the method outlined 

above in step 3.

Do not secure the building to 

the floor until the roof is fitted.

9x50mm Screws

50mm 

screw

Pre drill 

hole

2

4

Step 6

Parts needed - No. 4 QTY 2

Place the Roof Panels 

(No. 4)

 on top of the 

building making sure the framing in the 

roof panels sits firmly within the Gable 

Panels 

(No. 1 & 3.)

**Make sure that you have got the roof 

panels the correct way round with the 

recess at the top of the apex as shown 

in the diagram.**

**The edges of the roof panel must be 

flush with the outer cladding of the 

Gable Panels (No. 1 & 3).** 

Attach each roof to the building using 

6x30mm screws. 

12x30mm Screws

30mm 

screw

Pre drill 

hole

4

4

Step 7

Secure the building to the floor 

using 10x50mm screws.

Ensure the screws line up with the 

floor bearers

10x50mm Screws

50mm 

screw

Pre drill 

hole

Содержание 05DTMBAX0103SD-V1

Страница 1: ...ine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treatment to preve...

Страница 2: ...ble QTY 1 AI 05S11MBAGP975X1965 V1 Roof Panel QTY 2 AI S11MBOHAR610X580 Floor QTY 1 AI R11MBF552X970 V1 Door QTY 1 AI S11FBMBZBD743X1680 V1 Fascias 12 x 80 x 610mm QTY 4 S1280 610MM Cover Trims 12 x 40 x 1727mm QTY 4 S1240 1727MM Bolt Block 28 x 28 x 160mm QTY 1 FS2828 160MM Finial QTY 2 SHED DIAMOND FINIAL 11 Pad Bolt QTY 1 PI 07 0035 12 T Hinges QTY 3 PI 02 1042 Nail Bag Felt Tacks x 30 30mm Scr...

Страница 3: ...o open Ensure that the screws go through the cladding and into the framing behind 21x30mm Screws Pre drill hole 30mm screw PLEASE NOTE Before fitting the hinges ensure the door is in the correct position depending on which side you want the door to open See external illustration which show the doors internal framing Step 3 Parts needed No 9 QTY 1 No 11 QTY 1 Attach the bolt block No 9 to the insid...

Страница 4: ...r until the roof is fitted 9x50mm Screws 50mm screw Pre drill hole 2 4 Step 6 Parts needed No 4 QTY 2 Place the Roof Panels No 4 on top of the building making sure the framing in the roof panels sits firmly within the Gable Panels No 1 3 Make sure that you have got the roof panels the correct way round with the recess at the top of the apex as shown in the diagram The edges of the roof panel must ...

Страница 5: ...ims No 8 at each corner using 3x30mm screws per trim 12x30mm Screws 30mm screw Pre drill hole Pre drill hole 40mm screw Step 10 Parts needed No 7 QTY 4 No 10 QTY 2 Fix the Fasicas No 7 and finials No 10 in place using 40mm screws Make sure to trap the felt between the fasicas and building 8x40mm Screws 10 10 7 7 7 7 Step 11 Parts needed No 13 QTY 2 Fix the Turn Button No 13 onto the Door Panel No ...

Страница 6: ...P 6 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled ...

Страница 7: ...P 7 2 1 3 4 ...

Страница 8: ... 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE ...

Отзывы: