P 4
Please retain product label and instructions for future reference
Step 4
Parts needed - No. 2 QTY 1
No. 3 QTY 1
Place the plain gable
(No. 3)
and
one plain side
(No. 2)
onto the
floor and secure together using
3x50mm screws.
Do not secure the building to
the floor until the roof is fitted.
3x50mm Screws
50mm
screw
Pre drill
hole
3
2
1
Step 5
Parts needed - No. 1 QTY 1
No. 2 QTY 1
Fix the door gable
(No. 1)
and
the second plain side
(No. 2)
using the method outlined
above in step 3.
Do not secure the building to
the floor until the roof is fitted.
9x50mm Screws
50mm
screw
Pre drill
hole
2
4
Step 6
Parts needed - No. 4 QTY 2
Place the Roof Panels
(No. 4)
on top of the
building making sure the framing in the
roof panels sits firmly within the Gable
Panels
(No. 1 & 3.)
**Make sure that you have got the roof
panels the correct way round with the
recess at the top of the apex as shown
in the diagram.**
**The edges of the roof panel must be
flush with the outer cladding of the
Gable Panels (No. 1 & 3).**
Attach each roof to the building using
6x30mm screws.
12x30mm Screws
30mm
screw
Pre drill
hole
4
4
Step 7
Secure the building to the floor
using 10x50mm screws.
Ensure the screws line up with the
floor bearers
10x50mm Screws
50mm
screw
Pre drill
hole
Содержание 05DTMBAX0103SD-V1
Страница 7: ...P 7 2 1 3 4 ...
Страница 8: ... 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE ...