P 8
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
Step 16
Fix the Casement stay
(No. 18)
to the
opening window then align the fixings
onto the window panel frame. Ensure the
casement stay fits onto fixings when
closed before screwing them down using
6x20mm screws.
6x20mm Screws.
Pre drill
hole
20mm
screw
6x20mm screws per casement stay
Step 17
Place the Roof panels
(No. 5)
&
(No. 6)
on top of each gable,
making sure they are flush to
each gable and meet at the top
of the apex.
Secure each roof panel to the
building using 16x50mm screws.
16x50mm Screws.
*IMPORTANT:
Ensure both roof
sections meet at the top of the
apex as shown in the illustration.
Pre drill
hole
50mm
screw
*
Step 18
Attach the Roof Support bar
(No. 12)
to the roof panels using 5x40mm
screws.
Screw diagonally through the
support into the roof panel as shown
in the diagram.
5x40mm Screws.
Pre drill
hole
40mm
screw
Step 19
Fix the door
(No. 7)
to the build-
ing using 16x30mm black screws
per Butterfly Hinge
(No. 17)
as
shown in the diagram.
16x30mm Black Screws.
Fit the turn buttons
(No. 22)
to
the building using 2x30mm black
screws.
2x30mm Screws.
Pre drill
hole
30mm
screw
5
6
12
7
22
17
18
Содержание 04GREEN0606SDPB-V1
Страница 11: ...P 11 1 2...
Страница 12: ...P 12...