P 6
Please retain product label and instructions for future reference
Step 9
Fix the two Door strips
(No. 15)
to either
side of the door panels with 3x30mm
screws per strip.
6x30mm Screws.
Pre drill
hole
30mm
screw
Step 8
Fix the Gable tops
(No. 4)
&
(No. 5)
to the
panels using 4x50mm screws per top as
shown in the diagram.
8x50mm Screws.
The building can now be attached to the
floor framing with 6x50mm screws per
side.
24x50mm Screws.
Pre drill
hole
50mm
screw
Step 10
Fix the Door strip
(No. 17)
to the top of
the door opening with 3x30mm screws.
3x30mm Screws.
Pre drill
hole
30mm
screw
Step 11
Lay the roof panel down (No. 6) and place
the styrene sheets (No. 30, 32) in position
using the beads (No. 20) which will be
screwed down with 2x16mm screws.
Ensure the thinner edge of the frame is
facing the bottom.
8x16mm Screws.
Pre drill
hole
16mm
screw
20
6
4
5
15
15
31
32
Содержание 04GREEN0406SD-V5
Страница 1: ...P 1 04GREEN0406SD V5 x2 4 X 6 GREENHOUSE ASSEMBLY INSTRUCTIONS 04GREEN0406SD V5...
Страница 11: ...P 11 1 2...
Страница 12: ...P 12...