background image

P 6

16    

Step 14

Fix the rain guards above each

window, securing in place

using 2x50mm screws per

guard, ensuring to screw 

through the framing.

4x50mm Screws

Pre drill 

hole

50mm 

screw

Please retain product label and instructions for future reference

 

Step 11

Cut the felt into 3 strips of 2500mm 

length and place onto the roof, as 

shown in the illustration.

*Ensure there is approximately

50mm overhang of felt

around all sides of the

building.

Fix into place using 110x

felt tacks at 100mm 

intervals.

110x Felt Tacks

Felt 

tacks 

13

13

13

13

Step 12

Screw the cover trims to each

corner of the building with

3x30mm screws per trim.

12x30mm Screws

Pre drill 

hole

30mm 

screw

15

14

14

Step 13

Attach the fascia’s and finial’s

to the the front and back of the

building using 12x40mm screws.

12x40mm Screws

Pre drill 

hole

40mm 

screw

HANDLE

WITH CARE

1

2

3

4

Содержание 03VER0808-V2

Страница 1: ...ended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoi...

Страница 2: ...h 2411mm Width 2484mm Height 2569mm Base Dimensions Length 2350mm Width 2360mm Please retain product label and instructions for future reference Before assembly please make sure you have a suitable ba...

Страница 3: ...framing of the door panel using 3x butt hinges per door Fix to the door using 3x25mm screws 3x30mm screws to the framing per hinge ensure the doors open freely folding back into the building unrestri...

Страница 4: ...the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 8x50mm Screws Pre drill hole 50mm screw 2 4 Step 5 Fix the corners with 50mm screws as shown in th...

Страница 5: ...nterlock Secure in place using 4x50mm screws per gable top screwing in an alternating pattern 8x50mm Screws Pre drill hole 50mm screw 11 Pre drill hole 25mm screw 12 7 7 Step 9 Attach 2x eaves frames...

Страница 6: ...f as shown in the illustration Ensure there is approximately 50mm overhang of felt around all sides of the building Fix into place using 110x felt tacks at 100mm intervals 110x Felt Tacks Felt tacks 1...

Страница 7: ...bolts These will act as the catch for the barrell bolts at the top of your door Ensure the holes are drilled in to the 2 x 1 framing attached in step 15 as oppose to the door frame A 70mm screw Pre dr...

Страница 8: ...indow cover that sealant is used to keep the building weather tight Step 18 Attach a strip to the hinged side of the middle opening doors These strips allow you to adjust the doors allowing for moistu...

Отзывы: