background image

P 8

Please retain product label and instructions for future reference

             

It is ESSENTIAL that you apply wood treat-

ment immediately after the building has 

been assembled.

Step 19

Parts needed -           x2 

Attach two turn buttons (No. 21)  to 

the slave door at the top and 

bottom of the door using 1x30mm 

black screws.

2x30mm black screws

30mm 

screw

Sla

ve D

oor

Lock
ing D

oor

Step 17

Parts needed -          &           x2 

 

Position the press lock 

(No. 17)  onto the master door. 

Ensure it is align with the key 

hole and fix into position using 

4x10mm screws.

 

Then fit a barrel bolt 

(No. 18)  to the top and bottom 

of the slave door as shown in 

diagram. Use 4x10mm screws 

per barrel bolt.

Drill a hole in the framing above 

and below the door for the barrel 

bolt to fix into.

12x10mm screws

Pre drill 

hole

10mm 

screw

Step 18

Parts needed -           x2 

To fix the Chrome handles (No. 

19) firstly pre drill hole approxi-

mately 5mm in the middle of the 

door framing, then screw the 

handle in as shown using 

2x35mm bolt from behind the 

door. Repeat with other handle.

Please disregard screws supplied 

with handles as they are too 

short.

4x35mm bolts

35mm bolt

17

19

18

18

17

19

21

A

B

A

B

Pre drill 

hole

Pre drill 

hole

INSIDE OF BUILDING

21

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Содержание 03OVLPBRN0705-V3

Страница 1: ...rain or snow Our buildings are pre treated with a water based treatment this only helps to protect the product during transit and for up to 3 months against mould To validate your guarantee and ensure...

Страница 2: ...21 22 35mm Bolt x4 Nail Bag 50mm Screw x 22 Felt Tacks x 80 30mm Screw x 120 10mm Screw x 12 30mm Black Screw x 2 Corner Brace QTY 2 PI 07 0012 Finial QTY 2 SHED DIAMOND FINIAL Chrome Handle QTY 2 PI...

Страница 3: ...diagram Note Do not screw to the floor at this stage 3x50mm screws Step 3 Parts needed Place the other plain side No 3 onto the floor and fix in the same way with 3x50mm screws Note Do not screw to th...

Страница 4: ...w 7 Step 5 Parts needed x2 2 x8 To fix the Windows into the panels that accomodate a window Position the Window No 4 central into the window opening Fix the Window Block No 22 to the Window central as...

Страница 5: ...Roof Sheet No 8 as shown in the image Ensure to screw through the roof into the eave fix using 4x30mm screws per eave Repeat with the other roof sheet 8x30mm screws Step 8 Parts needed x2 To attach t...

Страница 6: ...s equal spacing between the floor and cladding on all 4 sides Fix using 3x50mm screws per panel 12x50mm screws 12 12 30mm screw Step 13 Parts needed x2 Fix the fascia blocks No 14 to the underside of...

Страница 7: ...roof as shown in the diagram ensuring there is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 80 Felt Tacks Step 15 Parts needed x4 Attach the fascias No 11 to the front and...

Страница 8: ...l bolt No 18 to the top and bottom of the slave door as shown in diagram Use 4x10mm screws per barrel bolt Drill a hole in the framing above and below the door for the barrel bolt to fix into 12x10mm...

Отзывы: